Ingka Group (IKEA) Acquires 9 Solar Power Projects in Europe for €340 Million Updated On Thu, Apr 7th, 2022 by Saurenergy Sweden-based Ingka Group, which owns the majority of IKEA stores globally, has announced that it has acquired nine solar power park projects in Germany and Spain for €340 million. The combined capacity of the solar projects comes to 440 MW. The Ingka Group solar has acquired the portfolio from solar power developer ENERPARC. Four solar power projects […] Read more
Assistant Manager – Solar Technical Updated On Mon, Apr 4th, 2022 by Saurenergy This position will be work package responsible for designing of Solar PV plant, LCoE reduction and quality assurance across an international portfolio of projects. This includes working alongside and coordinating with international team and contribute to growing and dynamic Statkraft portfolio. Your role: The following tasks are part of your job profile: Plant generation analysis using […] Read more
CERC Adopts Tariff for SECI’s Manufacturing Linked Solar Tenders Updated On Mon, Apr 4th, 2022 by Saurenergy The Central Electricity Regulatory Commission (CERC) has accepted Solar Energy Corporation of India Limited’s (SECI) request for the adoption of tariff for 8800 MW of solar power plants connected to inter-state transmission system (ISTS) linked with setting-up of solar manufacturing plant, selected through competitive bidding process as per the official guidelines issued by Ministry of […] Read more
Jetsar Solar Project Completely Operationalised by NTPC Updated On Mon, Apr 4th, 2022 by Saurenergy National Thermal Power Corporation Limited (NTPC) – the largest state owned power producer in the country – has announced that its Jetsar Solar PV Project located in Sri Ganganagar district of Rajasthan is now completely commercially operational. The electricity produced from the solar farm was supplied to the grid system in March end. NTPC said, […] Read more
Tata Power Commissions 300 MW Solar plant in Dholera Updated On Mon, Apr 4th, 2022 by Saurenergy Tata Power Renewables Energy Ltd (TPREL), a wholly-owned subsidiary of Tata Power has commissioned a 300 MW project in Dholera, Gujarat. It is India’s largest single-axis solar tracker system. The project will generate 774 MUs annually. The installation entails 873012 nos. of Monocrystalline PV Modules. The project was commissioned well within the stipulated timeline, according […] Read more
Himachal Government Hikes State Subsidy to Rs 6,000/kW for Rooftop Solar Updated On Mon, Apr 4th, 2022 by Saurenergy The state government of Himachal Pradesh has proposed to increase the subsidy for grid connected rooftop solar power installations in the state. The move is aimed to encourage the domestic players and households to adopt and install solar power systems. HIMURJA said that the subsidy will be increased from Rs 4,000 for every kilowatt to […] Read more
SECI Floats tender for 44 MW solar projects in Telangana Updated On Wed, Mar 30th, 2022 by Saurenergy The Solar Energy Corporation of India (SECI) has issued an EPC tender to invite bids for the development of 44 MW of solar projects, along with 10 years of O&M at Singareni Collieries Company Limited (SCCL), Telangana. FULL SCOPE OF THE PROJECT: Tender for Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 44 MW (AC) […] Read more
Cleantech Solar commissions 1 MW rooftop solar PV system for SeniorAerospace in Thailand Updated On Tue, Mar 29th, 2022 by Saurenergy Cleantech Solar has commissioned a 1 MW on-site rooftop solar PV system at the manufacturing facility of Senior Aerospace Thailand in Laem Chabang. The project provides solar power to Senior Aerospace under a long-term Power Purchase Agreement (PPA), signed between Senior Aerospace (Thailand) Ltd., a subsidiary of Senior plc – an international manufacturer of high-technology components […] Read more
Jakson Signs Up For BOS package for 245 MW Nokh Solar Park of NTPC Updated On Mon, Mar 28th, 2022 by Saurenergy Jakson, one of the oldest and leading energy solution providers has entered into contract agreement with NTPC Limited for execution of “Balance of System (BOS) package for development of 245MW for Block/Plot No.-3 of Nokh Solar Power Project (735MW)” within 18 Months. The Jakson group is a well diiversified energy services and products firm. NTPC […] Read more