Electric Utility Company Iberdrola To Commission 1,400 MW of New Solar Power Updated On Mon, Aug 29th, 2022 by Saurenergy Spanish utility firm Iberdrola has announced that it will add 1,400 MW of new solar power in Spain in the coming months. As per the official statement, Iberdrola is currently executing 12 photovoltaic projects, with a combined installed capacity of 550 MW, half of them located in Extremadura, where Iberdrola is building the Almaraz I […] Read more
SJVN Issues Tender For 15 MW Floating Solar Plant in Himachal Pradesh Updated On Mon, Aug 29th, 2022 by Saurenergy SJVN Green Energy issues tender / invites online bids for a 15MW floating solar PV power plant at Nangal Pond, Near Village Neilla, District Bilaspur, Himachal Pradesh. The Solar Modules to be used for this project shall be sourced only from the Model and Manufactures included in the latest “Approved List of Models and Manufactures […] Read more
O2 Power Acquires Emmvee Group’s Solar Plant Portfolio of 55 MW Updated On Thu, Aug 25th, 2022 by Saurenergy Delhi-based renewable energy producer, O2 Power has announced the acquisition of several solar power plants from Bangalore-based solar modules manufacturer Emmvee Photovoltaic Power. According to the company, these plants are located in Karnataka and Telangana and have a combined installed capacity of 55MW. A portion of this capacity is used to power state DISCOMs, and […] Read more
WBSEDCL Issues Tender for Floating Solar Project at West Bengal Updated On Thu, Aug 25th, 2022 by Saurenergy West Bengal State Electricity Distribution Company Limited (WBSEDCL) plans to develop Grid Connected Floating Solar PV Power Plant of 10 MW (AC) capacity at the Upper Dam of Purulia Pump Storage Project Site, Ajodhya Hills, Barria Mouza, Baghmundi in Purulia District of West Bengal. The last date for submitting the online bid is September 19, […] Read more
WBSEDCL Issues 10 MW Solar Project Tender for EPC and O&M Work Updated On Tue, Aug 23rd, 2022 by Saurenergy West Bengal State Electricity Distribution Company Limited (WBSEDCL) intends to develop two grid-connected & ground mounted solar PV power plant of 10 MW solar project (each) at Gangapur-I and Gangapur-II respectively under Rajnagar Block in Birbhum District of West Bengal. The last date for submitting the online bid is September 26, 2022, till 04:00 pm. […] Read more
Haryana Government Issues 10 MW Grid-Connected Solar Plant Tender Updated On Tue, Aug 23rd, 2022 by Saurenergy Haryana Government has invited bids for the supply of 10.4 MWp of Grid-Connected Rooftop (GCRT) SPV Power Plants without a battery storage system or with LiFePO4 Battery Bank. The last date and time of submission of the tender is September 02, 2022, till 2:00 pm, and the bid will be opened on the same day […] Read more
North America’s EDF Renewables Operationalises Palen Solar Site With Storage Updated On Tue, Aug 23rd, 2022 by Saurenergy EDF Renewables North America (EDFR) has announced that its Palen Solar site is fully operational and delivering green energy to the grid. The site consists of four projects totaling 620 megawatts (MWdc) of solar PV plus 200 MWh of battery energy storage. The official statement of EDF held that the projects, which utilize horizontal single-axis […] Read more
IRENA Report on Renewable Power Generation Costs in 2021 Updated On Mon, Aug 22nd, 2022 by Saurenergy International Renewable Energy Agency (IRENA) has published this research report titled Renewable Power Generation Costs in 2021. In 2021, the cost-effectiveness of renewable energy increased further. Their crucial role in the transition to an economical and technically achievable net zero future is confirmed by data from the IRENA Renewable Cost Database and analysis of current […] Read more
UPMRCL Invites Bids For Solar Rooftop E-Tenders For Kanpur Metro Project Updated On Fri, Aug 19th, 2022 by Saurenergy Uttar Pradesh Metro Rail Corporation (UPMRCL) has floated an E-Tender to install and commission 1 MW of rooftop solar systems at the Kanpur metro project. The last date for submitting the online bid is September 28, 2022, till 10:00 am. Bids will be opened on September 29, 2022, at 03:00 pm. This MGVCL 42.8 MW […] Read more