Sterling and Wilson Emerges As L1 Bidder for NTPC Khavda RE Park Order Updated On Tue, Aug 23rd, 2022 by Saurenergy Leading EPC player Sterling and Wilson Renewable energy has informed the stock exchanges that the company has emerged as the L-1 bidder for the BOS package comprising 4 blocks of the proposed solar PV plant of NTPC Renewable Energy Limited at Khavda RE Power Park, Rann of Kutch, Gujarat with an aggregate capacity of ~ […] Read more
Electrical Engineer Green Hydrogen Updated On Fri, Aug 19th, 2022 by Saurenergy As Electrical Engineer for Green Hydrogen, you will be largely responsible to bring in and apply the expertise of various renewable energy sources (solar PV, wind) and their integration with electrolyzers as well as downstream process equipment to produce Green Hydrogen. You are required to apply cross-domain expertise in renewable energy generation, power electronics, electrical […] Read more
Lead Engineer – Systems Engineering Updated On Thu, Aug 11th, 2022 by Saurenergy As a Lead Control and Protection engineer you will report to the Control Systems Manager. The successful candidate will be part of a highly motivated and dynamic team of engineers working on the system requirements, design & performance verification of Control and Protection functions for LCC and VSC HVDC schemes. The development of such Control […] Read more
Chicago Sets Sights On Acquiring 100% Renewable Energy By 2025 Updated On Wed, Aug 10th, 2022 by Saurenergy The city of Chicago in the USA has committed to acquiring 100% renewable energy by 2025 for use in all city facilities and activities, and as the first step in that process, has reached an agreement with electricity provider Constellation for the purchase of renewable energy. A 593MW solar PV plant will be built by […] Read more
X-ELIO Awarded 15 MW First Feed-In-Premium Auction In Japan Updated On Mon, Aug 8th, 2022 by Saurenergy Spanish renewable energy developer company X-ELIO has received 15 MW from the Ministry of Economy and Trade Industry (METI) in Japan’s first Feed-in-Premium (FIP) auction, which awarded 153.7 MW of new solar PV capacity. This first FIP auction since COD saw the award of the company’s 15 MW project. The predicted start date for commercial […] Read more
APTEL Provides Relief To CSP Developers On Force Majeure Grounds Updated On Wed, Jul 27th, 2022 by Saurenergy In an important judgement that will hopefully close the chapter on a festering dispute, the Appellate Tribunal for Electricity (APTEL) has allowed multiple developers stuck with Concentrated Solar Thermal (CSP) projects to get relief from liabilities, caused due to lower DNI (Direct Natural Irradiance) than they had assumed when bidding. The developers impacted include Godavari […] Read more
Control Engineer – Electrical & Renewable Updated On Tue, Jul 26th, 2022 by Saurenergy Engineer will be directly responsible for Power Plant controls engineering for renewable energy i.e. Solar, Wind, Microgrid projects Engage in understanding the engineering drawings to prepare and study technical data,Specification requirements for renewable energy (Solar, Wind, Hybrid) power plants. Engage in Controls application engineering and testing phases of renewable energy including Solar, BESS, Wind power […] Read more
Orsted Acquires Ostwind; Eyes Key Markets in Europe Updated On Mon, Jul 25th, 2022 by Saurenergy Renewable energy player Orsted has announced the signing of an agreement with Germany based Ostwind, a leading German developer, owner, and operator of onshore wind and solar power projects in Germany and France. For a consideration of EUR 689 million, Orsted will acquire a 100 % equity interest in OSTWIND Erneuerbare Energien GmbH, OSTWINDpark Rotmainquelle GmbH & […] Read more
Recruitment of experienced professionals on fixed term basis in the area of Renewable Energy Updated On Thu, Jul 21st, 2022 by Saurenergy NTPC Limited is India’s largest integrated power company with installed capacity of 69,134 MW and has presence in the entire value chain of the power generation business. Commensurate with our country’s growth challenges, NTPC has embarked upon an ambitious plan to attain a total installed capacity of 130 GW by 2032. NTPC is looking for […] Read more