ReneSola Unveils TWIN 3.0 Series of Modules at SNEC 2021 Updated On Tue, Jun 8th, 2021 by Saurenergy At the SNEC PV POWER EXPO 2021, in Shanghai New International Expo Center, ReneSola (backed by the Zhongnan Group, a large conglomerates in China) unveiled new product series TWIN 3.0 and achieved many cooperative agreements to strengthen its supply chain further. TWIN 3.0, which is said to have a power rating upto 550Wp with efficiency […] Read more
Solar MGR – Civil Updated On Tue, Jun 8th, 2021 by Saurenergy Dimensions parts or elements for a technical solution as to the requirements and related to a specific technical field. Checks the possibilities for technical realization regarding the requirements. Drafts the technical realization of the requirements within the technical discipline. Dimensions elements, components or software by calculation or by their specification according to the requirements and, […] Read more
IREDA Extends Bid Date For 12 GW CPSU Solar Scheme Updated On Tue, Jun 8th, 2021 by Saurenergy Indian Renewable Energy Development Agency Ltd. (IREDA), the implementing agency appointed by Ministry of New & Renewable Energy (MNRE) for the CPSU Scheme Phase II has extended the bid submission date to 15th June. The Central Public Sector Undertaking (CPSU) scheme phase-II envisages setting up 12,000 MW grid-connected solar projects with viability gap funding (VGF). […] Read more
Cell Shortage Forces Timeline Extension by MNRE For CPSU Phase II Solar Updated On Tue, Jun 8th, 2021 by Saurenergy As predicted by many Industry experts, domestic cell production has failed to keep up with demand for various central schemes that mandate local sourcing. Now the Ministry of New And Renewable Energy (MNRE) has stepped in to provide and extension to projects under tranche I and II of the CPSU Phase II scheme. The MNRE […] Read more
Antaisolar launches SPACE Solar Tracker At SNEC Updated On Mon, Jun 7th, 2021 by Saurenergy Xiamen, China based Antaisolar, a leading supplier of PV mounting systems, celebrated its 15th anniversary by launching its latest SPACE solar tracker at SNEC 2021 in Shanghai. The firm claims that its new launch is the world’s longest 1P independent single-axis tracking system that can be extended to more than 4 strings, maximum 240m in […] Read more
LONGi Unveils Hi-MO N Module & ‘Lifecycle Quality’ Standard at SNEC ’21 Updated On Fri, Jun 4th, 2021 by Saurenergy Xi’an-headquartered major solar PV manufacturer LONGi turned heads at the The 15th International Photovoltaic Electricity Generation and Smart Energy Conference & Exhibition (SNEC 2021), which opened on June 3rd in Shanghai, China, releasing a new module called Hi-MO N and a “Lifecycle Quality” standard for its products. In this premier industry exhibition, LONGi unveiled its Hi-MO […] Read more
Haryana Govt Tenders For 15,541 Solar Home, Lighting Systems Updated On Fri, Jun 4th, 2021 by Saurenergy In a detailed tender issued this week, the government of Haryana has asked for bids for supplying Solar Home Systems, and Solar Lighting Systems to the state. These will be used by Anganwadi Centres, Schools and other Government and Public buildings in Haryana. The tender has two models. Model One, for supply installation and commissioning […] Read more
NHPC’s Tariffs For 2000 GW ISTC Solar Adopted By CERC, But Regulator Not Happy Updated On Thu, Jun 3rd, 2021 by Saurenergy NHPC’s largest solar tender to date, the 2000 MW ISTS connected tender, which it concluded in July 2020 by allotting LOA’s (Letter of Award) to the 7 final successful bidders, has got tariffs for the projects adopted finally, after a slight delay. But what should have been a standard procedure turned into a slightly embarassing […] Read more
Tata Power Solar Adds 210MWp NTPC Award To EPC Portfolio Updated On Thu, Jun 3rd, 2021 by Saurenergy Tata Power Solar, India’s largest integrated solar company and a wholly-owned subsidiary of Tata Power, has received “Letter of Award” (LoA) to build 210 MWp of Solar PV projects for NTPC. The total order value of the projects is approximately Rs 686 crore. The commissioning date has been set for November, 2022. With this addition, […] Read more