Maharashtra Energy Development Issues 10 MW Rooftop Solar PV Tender Updated On Tue, Jul 5th, 2022 by Saurenergy Maharashtra Energy Development Agency (MEDA) has invited expression of interest (EoI) for discovering the tariff for the 10 MW Grid-Connected Rooftop Solar PV Systems under the RESCO model. This solar power plant will be installed on the State Government Sector Buildings terrace / Ground. The last date to submit the bid is July 18, 2022, […] Read more
Bangalore Metro Rail Floats Tender For 20 MW Of Grid Connected Rooftop Solar System Updated On Mon, Jul 4th, 2022 by Saurenergy Bangalore Metro Rail Corporation Ltd (BMRCL) has invited bids for a grid-connected rooftop solar photovoltaic system of 20 MW. This tender includes design, engineering, supply, construction, erection, testing, commissioning, and grid synchronization. The power developer will be responsible for O&M, warranty for 25 years under RESCO Model. The last date to submit the bid is […] Read more
Irish Study Says Rooftop Solar Panels Can Produce 1/4 th Of Total Electricity Needed Updated On Fri, Jul 1st, 2022 by Saurenergy A quarter of total electricity needed by Irish households can be produced by installing solar panels on the domestic rooftops. Conducted by the climate scientists at University College Cork, Ireland, this was the conclusion of the study after the team had thoroughly examined every rooftop in the country using satellite imagery and weather data for […] Read more
MPUVNL Tender Invites Bids For 35 MW Rooftop Solar Systems Updated On Wed, Jun 29th, 2022 by Saurenergy Madhya Pradesh Urja Vikas Nigam Limited has floated a tender inviting bids for installation of 35 MW grid-connected rooftop solar systems. The bids will extend to operations and maintenance of the project for 25 years. The tender mentions that the last date for online submission of the bids is July 13, 2022. The earnest money […] Read more
DMEGC Rolls Out New Monocrystalline PERC M10 Rooftop Solar Modules Updated On Wed, Jun 29th, 2022 by Saurenergy Chinese module maker DMEGC has released its new monocrystalline PERC solar panels with power conversion efficiencies of up to 20.91% and temperature coefficients of -0.33% per degree celsius becoming quite useful for the maximum system voltages of 1,000 W or 1,500 W. The launch comes even as the domestic market in China continues to expand, […] Read more
J&K approves 200 MW rooftop solar project in Jammu city Updated On Mon, Jun 13th, 2022 by Saurenergy The Administrative Council (AC) headed by LG Manoj Sinha, has approved the development of 200 MW of grid-connected rooftop solar power plants in Jammu City. These plants hope to take the optimal advantage of the solar irradiance in the high resource region of Jammu and Kashmir. They will come up as part of the ‘Solar […] Read more
South Western Railway installs 4600 KWp rooftop solar Updated On Tue, May 10th, 2022 by Saurenergy The Indian Railways has made some of the most ambitious pledges to decarbonise, starting with the promise to be 100% electric by 2024 and net zero by 2030. While those ambitions are still some way off, progress continues to be steady on the ground. As of January this year, with plans to install solar at […] Read more
California revisits proposal on reforming rooftop solar policy Updated On Tue, May 10th, 2022 by Saurenergy California is asking solar companies, utilities and others to weigh in yet again in a long-standing process to reform the state’s key rooftop solar power incentive, the state’s public utilities regulator said in a document filed on Monday. The California Public Utilities Commission is seeking additional input into a proposal issued last year that was […] Read more
Cleantech Solar Commissions 625 kWp Rooftop Solar for Yachiyo India Updated On Fri, Apr 29th, 2022 by Saurenergy Cleantech Solar has announced that it has commissioned a 625 kWp rooftop solar photovoltaic (PV) system at the manufacturing facility of Yachiyo India Manufacturing Private Limited in Bhiwadi, Rajasthan. Cleantech Solar said that the project was executed in record time, taking just 59 days from PPA signing to commissioning, including obtaining all regulatory and net […] Read more