Solar Philippines Nueva To Build 4GW Solar Plant Updated On Fri, Aug 19th, 2022 by Saurenergy Solar Philippines Nueva plans to expand its 500 MW system currently under construction on the northern Filipino island of Luzon with a 3.5 GW solar farm. Solar Philippines Nueva is the listed subsidiary of PV project developer, Solar Philippines, which is the largest solar energy provider in the Philippines. With the money raised through various […] Read more
NTPC Increases Solar Output, Installs 69.5 GW Capacity Updated On Fri, Aug 19th, 2022 by Saurenergy With the commissioning of the 56 MW Kawas Solar PV Project at NTPC Kawas, Gujarat, on August 15, 2022, NTPC Limited reached 69454 MW (69.5 GW Capacity) of group installed and commercial capacity. By installing renewable energy projects in its current stations as well as constructing new green field RE projects, NTPC is constantly reducing […] Read more
Lead Engineers: Instrumentation-DCS/SCADA Updated On Thu, Aug 18th, 2022 by Saurenergy Accountabilities:- Responsible for mechanical engineering and design including design criteria, material selection and equipment sizing in compliance with codes and standards. Capable of leading a team of engineers/specialists/designers. Work with consultants to determine work scope requirements. Monitor and control project costs and report variance from plan. Upstream oil and gas facility engineering and design of […] Read more
Charging Infrastructure: The Backbone That is Driving a Transformation Updated On Thu, Aug 18th, 2022 by Saurenergy By Varun Goenka With global oil prices skyrocketing and petrol and diesel costs going up almost on a daily basis, there is an urgent need to switch over to a more sustainable energy option. Recognizing this, the Indian government has been actively trying to promote the use of electric vehicles (EVs). The Centre and several […] Read more
KREDA Issues Tender for Solar Battery Banks in Ladakh Updated On Thu, Aug 18th, 2022 by Saurenergy Kargil Renewable Energy Development Agency (KREDA) has floated a tender for supply, Installation and commissioning of solar tubular gel battery banks of various capacities at various locations across the Kargil District in the union territory of Ladakh. A high-performance tubular gel battery with a polypropylene copolymer container should be used. A pressure regulation valve should […] Read more
Hygenco & Jindal Stainless Collaborate for Green Hydrogen Updated On Thu, Aug 18th, 2022 by Saurenergy Haryana-based Green Hydrogen solutions developer, Hygenco India has signed a long-term green hydrogen offtake agreement with Jindal Stainless Limited. Under the terms of the agreement, Hygenco will be responsible for building, owning, and operating a multi-megawatt green hydrogen facility for 20 years. Jindal Stainless Ltd will be able to reduce its carbon emissions by approximately […] Read more
India Added 1.9GW Of RE Open Access Capacity In FY22 Updated On Thu, Aug 18th, 2022 by Saurenergy The falling costs of renewable energy and the decarbonisation goals of commercial and industrial consumers are driving the uptake of renewable energy open access power. The renewable energy open access (OA) market, which has been expanding in almost all key renewables-rich states in recent years, will continue to overcome policy hurdles to grow organically in […] Read more
US Investment Platform CleanCapital Invests in Largest Solar Project in Alaska Updated On Thu, Aug 18th, 2022 by Saurenergy Renewable energy investment platform, CleanCapital has announced a corporate investment in Alaska-based solar developer Renewable IPP. The company has also made a commitment to fund an 8.5 megawatt (MW) solar project and the future development of a pipeline. The official statement of CleanCapital read that when completed, the 8.5 MW solar project, which will supply […] Read more
CERC Proposes Generic Tariffs For Hydro, Biomass Projects In FY23 Updated On Wed, Aug 17th, 2022 by Saurenergy The Central Electricity Regulatory Commission (CERC) has proposed tariffs ranging between ₹4.76–5.84 per kilowatt hour (kWh) for several small-scale hydro projects across the Indian states for FY23. For hydro projects under 5 megawatts (MW) in the states of Himachal Pradesh, Uttarakhand, West Bengal, and North Eastern States, and Jammu and Kashmir and Ladakh, CERC has […] Read more