Envision Gets 1GW Wind & 320 MWh BESS Orders From Juniper Updated On Thu, Jan 9th, 2025 by Saurenergy Envision Energy India announced that it has signed up with Juniper Green Energy (JGE) for the supply of 200 EN 182|5MW Turbine Platform and its maiden 320 MWh BESS (Battery Energy Storage Systems). JGE will deploy the wind turbine generators (WTG) for various projects won under State & Central auctions and the BESS package for […] Read more
Kerala Govt Plans To Solarise Its Health Centers Updated On Thu, Jan 9th, 2025 by Saurenergy The Kerala government has now planned to augment the growth of solar energy at its health centres. In the latest development, the state Agency For New & Renewable Energy Research and Technology (ANERT) has issued multiple tenders to solarise selected health centers, seeking vendors. The state nodal agency has now planned to install a 15 […] Read more
Canadian Solar’s e-STORAGE To Deliver 2 GWh ESS For CIP Updated On Thu, Jan 9th, 2025 by Saurenergy Canadian Solar Inc.’s e-STORAGE, a part of the company’s subsidiary CSI Solar Co., Ltd. (CSI Solar), recently signed contracts with Copenhagen Infrastructure Partners (CIP), through its fund CI IV. The contracts cover the delivery of 2 GWh DC of battery energy storage systems (BESS) for two projects in Scotland. The 1 GWh DC Coalburn 2 […] Read more
ACME Solar Commissions 90 MW Solar Project In Rajasthan Updated On Thu, Jan 9th, 2025 by Saurenergy ACME Solar Holding (ASHL) has now commissioned an additional aggregate capacity of 90 MW of solar power projects in Rajasthan. The company secured this project through its subsidiaries, viz. ACME Dhaulpur Powertech Private Limited and ACME Raisar Solar Energy Private Limited, to commission the remaining capacity of 62 MW and 28 MW, respectively. These two […] Read more
Karnataka HC Orders Puts Green Energy Open Access In Limbo Updated On Thu, Jan 9th, 2025 by Saurenergy A recent order from the Karnataka High Court has created ripples in the state’s renewable energy market. The court struck down the Central government regulations on Green Energy Open Access and the state regulations floated by the Karnataka Electricity Regulatory Commission (KERC). However, it directed the KERC to frame appropriate regulations for granting open access […] Read more
Govt Brings Draft Rule To Lower Tariffs For EV Users Updated On Wed, Jan 8th, 2025 by Saurenergy The latest draft rule made by the Ministry of Heavy Industry (MHI) has proposed new benefits under the PM-Drive scheme. The PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) Scheme aims to boost electric mobility in the country with a special focus on electric buses and other electric vehicle segments. Currently, the EV […] Read more
India’s Top Solar Module Makers In December 2024 Updated On Wed, Jan 8th, 2025 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has released its latest data on the Approved List of Models and Manufacturers (ALMM), revealing that India’s enlisted solar module manufacturing capacity has crossed 64 GW. Currently, 97 domestic solar manufacturers are listed on the central government’s registry. While there are approximately 130 solar module manufacturers across […] Read more
Maharashtra: Mahindra Unveils Its EV Manufacturing, Battery Plant Updated On Wed, Jan 8th, 2025 by Saurenergy Mahindra recently unveiled its newly dedicated manufacturing and battery assembly facility at its Chakan (Pune) plant located in Maharashtra. It’s a fully integrated ecosystem to produce Electric Origin SUVs. The unit is located within the company’s 2.83 km-sq Chakan manufacturing hub. It is one of the large greenfield projects, a water-positive facility. It is 100% […] Read more
Teerth Gopicon, Reliance Win SJVN’s 5.8 MW Rooftop Solar Bid Updated On Wed, Jan 8th, 2025 by Saurenergy SJVN has declared Teerth Gopicon and Reliance Industries as the winners of its 5,830 kW grid-connected solar project tender. The tender was floated under the PM Surya Ghar scheme. The tender for this project was released in September, and the results were declared within four months. According to the tender results, Teerth Gopicon secured 5,705 […] Read more