SUBSCRIBE NEWS LETTER

ReNew power

India Needs 100 GW Storage To Avoid Energy Shortages: Report

In a report that goes against the actions of the Indian government (more thermal, faster deployment of PSP), Berkeley has made a case for solar and battery storage to solve the country’s power demand issue. Solar plus storage can not only help to avoid power shortages in India but also help to prevent a solar […]

Read more

Material Quality – Electrical + Mechanical TL_SM

PRINICIPAL ACCOUNTABILITIES:- Review & approval of supplier documents, MQP, Type tests , inspection reports of  Steel Coils, Module mounting structures, Transmission Tower structures, various Conductors for Transmission, Construction steel, Robotic cleaning systems etc . Inspection and testing of above items by self and through TPIAs. Conducting, co ordinating and planning supplier/factory audits, product inspections and […]

Read more

Team Member-Project Execution Solar_AM

Roles and Responsibilities:- Manage vendors and a group of assigned engineers at the site level to ensure quality work execution according to the project schedule. Verify all drawings before releasing them for execution. Ensure civil work aligns with approved drawings. Ensure civil work adheres to the approved schedule. Oversee the Handover-Takeover (HOTO) process. Manage contract […]

Read more

Solar O&M – Senior Engineer

Supervising and verifying preventive maintenance as per schedule for solar power plant equipments e.g. Modules, Inverters. Checking inverters and Strings for faults and related. Rectifications, checking and rectification of defective strings and modules. Supervising any breakdown maintenance. Coordinating with OEMs for spares, AMC, warranty and service requests. Contract Management. Location:- India. Company Overview:- ReNew Power, […]

Read more

Senior Engineer

Testing & Repairing of electronics Component & PCB. Inspection of incoming material BOM preparation and assembly of test fixture. Gerber design verification. Maintenance of test jig developed by central O&M team Material planning & handling of PCB repair station Planning and scheduling activities Inventory control & Management Supervising smooth implementation of the project. Data Entry in SAP […]

Read more

Site Incharge/Deputy Site Incharge Self O&M_AM

The Wind turbine Engineer/Technician will act as part of team to achieve safe and efficient Operation and Maintenance of WTG. To attend the breakdown calls & to ensure the smooth operation of the WPP. To share ownership of WECs along with PM team for execution of PM as per stipulated Schedules. The Wind Technician will […]

Read more

NTPC Discovers Tariffs Below Rs 4.65 In 3 GW FDRE 2 Auctions

NTPC’s 3 GW FDRE (Firm and Dispatchable Renewable energy)  Tranche 2 auctions. Meant to supply round the clock power through the Inter State Transmission System (ISTS), the auctions were launched in October last year, and widely seen as a key milestone in plans to add storage capacity to the grid.  The prices discovered by NTPC […]

Read more

CERC Order Paves Way For Bundling RE With Thermal For DVC

In an important order dated March 5 that paves the way for the signing of PPAs between Damodar Valley Corporation (DVC) on one side and ReNew Power and Avaada Energy for 500 MW of solar procurement, the Central Electricity Regulatory Commission (CERC) adopted the discovered tariffs proposed by DVC. The tariffs are notable for being […]

Read more

BluPine Energy Acquires 369 MW Solar Assets From Acme Group

BluPine Energy, a leading renewable energy services company established in India by Actis, has announced the successful acquisition of 369 megawatts of solar capacity power assets from the Acme Group. This strategic acquisition marks a significant milestone for BluPine Energy, taking its total renewable energy capacity to 2.4 Gigawatts, placing it squarely in the top […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll