Site QA/QC Engineer – E&I Updated On Thu, Oct 27th, 2022 by Saurenergy Preparation & Implementation Method statements, Procedures & ITPs pertaining to E&I works inline with Contract specification. E&I Sub-contractor workmen evaluation, induction & performance monitoring. Coordinate with client for QA/QC submittal approval, day-today inspections, audits, observation closure & final system clearance etc. Handle a team of E&I field QA/QC inspectors, monitor & mentor them periodically. Perform […] Read more
Tata Motors, Tata Power to Install 7 MW Solar Plant at Pantnagar Factory Updated On Tue, Oct 18th, 2022 by Saurenergy The two companies of the Tata Group – Tata Motors and Tata Power – have announced that they have entered into a Power Purchase Agreement (PPA) for the development of a 7 MW captive solar power project at its Pantnagar plant in Uttarakhand. According to the company, this installation is collectively expected to generate 215 […] Read more
India Crossed 11 GW of Solar Installations in First Six Months of FY 22-23 Updated On Fri, Oct 14th, 2022 by Saurenergy The renewable energy capacity data for September is out. Let’s have a look at how much solar capacity India created in September and compare it with data from 2021 and the same months from 2022. Year 2022 Month Name Solar Energy Wind Energy Others Jan-22 956.87 18.23 0.5 Feb-22 474.19 28.85 17.46 Mar-22 3218.77 227.8 […] Read more
Pennar Industries Wins EPC Contract For NTPC’s 500 MW Project At Bhadla Updated On Fri, Oct 14th, 2022 by Saurenergy Pennar Industries Limited (PIL) has informed us that it has won the EPC contract against its bid for a major solar project at Bhadla, Rajasthan. The project by NTPC Renewable Energy Limited (NTPC REL) is its proposed 500 MW AC / 625 MW DC Solar PV project at Bhadla, Rajasthan. PIL has emerged as the […] Read more
QA/QC Engineer – Mechanical Updated On Tue, Oct 11th, 2022 by Saurenergy Verification of materials, mill test certificates and confirming compliance to the code & company requirements during IMIR clearance. Conducting welding procedure qualification tests and maintaining procedure qualification records (PQR) for Structural, Tank & Piping works. Preparation of Welding Procedure Specification & conducting Procedure Qualification test at site per requirement. Verification of welding consumables BTCs & […] Read more
Over 3K E-Buses Will Operate In India In Next 2 Years Under Fame-ll Updated On Tue, Oct 11th, 2022 by Saurenergy Over the next two years, more than 3,000 additional electric buses will operate throughout the cities of India as part of the FAME-II program. Heavy Industries Minister Mahendra Nath Pandey claims that there are currently 3.049 electric buses operating on Indian roadways. Recently, the minister announced the program’s planned departure of 175 e-buses for Gujarat […] Read more
Adani Green Energy Buys 3 SPVs from Inox Green Energy Updated On Tue, Oct 11th, 2022 by Saurenergy Leading renewable energy company Adani Green Energy has revealed that it has acquired three entities from Inox Green Energy Services Limited (IGESL), a subsidiary of INOX Wind that is a wind power operation and maintenance (O&M) service provider. Each of the three entities holds 50 MW operational wind power projects at Dayapar, Gujarat. The three […] Read more
Adani Green Launches Three Step-Down Subsidiaries in Renewable Segment Updated On Tue, Oct 4th, 2022 by Saurenergy Three new subsidiary businesses for the renewable energy industry have been incorporated by Adani Renewable Energy Holding Four Limited. Adani Renewable Energy Holding Four Limited is its subsidiary, and the recently established firms are its step-down subsidiaries, according to a statement released by Adani Green Energy Ltd (AGEL). “Three brand-new subsidiaries have been incorporated by […] Read more
AGEL Commissions 600 MW Capacity of World’s Largest Hybrid Power Plant Updated On Fri, Sep 30th, 2022 by Saurenergy A wind-solar hybrid power plant in Jaisalmer, Rajasthan, with a 600 MW of capacity has been commissioned by Adani Green Energy (AGEL). The hybrid power project has been developed by two subsidiaries, Adani Hybrid Energy Jaisalmer Two and Adani Hybrid Energy Jaisalmer Three. According to the official statement, the project would include 150 MW of […] Read more