DLL Floats Tender for Supply of Solar Inverters for Solar Plant, Port Blair Updated On Wed, Nov 30th, 2022 by Saurenergy Directorate of Lighthouses and Lightships has floated a tender for the supply of solar inverters for the solar power plant at North Point Light House Port Blair. The last date for submitting the online bid is December 15, 2022, till 03:00 pm. Bids will be opened on December 16, 2022, at 03:00 pm. This solar […] Read more
Within 6 Months, We will be Expanding Our Module Capacity to 400 MW Updated On Wed, Nov 30th, 2022 by Saurenergy AT REI 2022 in Greater Noida’s Expo Centre, India’s renewable energy majors were present in strength this year. Saur Energy caught up with (Ashwin Patel, Managing Director, Credence Solar) to know more about their plans and expectations. Read more
Skilancer Robotic Cleaning is Taking Care of Arpund 1.2 GE OS Solar Installations Updated On Wed, Nov 30th, 2022 by Saurenergy AT REI 2022 in Greater Noida’s Expo Centre, India’s renewable energy majors were present in strength this year. SaurEnergy caught up with (Neeraj Kumar, Co Founder & Director, Skilancer Solar) to know more about their plans and expectations. Read more
Volkswagen’s Aurangabad Factory Adopts 100% Renewable Electricity Updated On Wed, Nov 30th, 2022 by Saurenergy By 2025, German motor vehicle manufacturer, the Volkswagen Group, hoped to have used only green energy (100% Renewable Electricity) at its Aurangabad site. Three years earlier than anticipated, the German automotive giant has already used only renewable energy at its Aurangabad production facility. In 2018, Skoda Auto Volkswagen India Private Limited (SAVWIPL) ordered the installation […] Read more
JinkoSolar’s Exclusive Corporate Event in Dhaka Gets Massive Response Updated On Wed, Nov 30th, 2022 by Saurenergy Jinko’s Solar South & Central Asia team, gathered in Bangladesh’s Capital Dhaka for an eventful week of client meetings and site visits. Bangladesh’s reaction and reception to Jinko’s technology and products were positive. “In the future, Jinko will become recognised as a significant and aggressive participant in the Bangladesh market. With our Tiger Neo offering, […] Read more
CCPI Report: “Background and Methodology” Updated On Wed, Nov 30th, 2022 by Saurenergy A study entitled “Background and Methodology” has been released by CCPI (Climate Change Performance Index). Understanding national and international climate policy is challenging since there are so many nations that need to be considered, and each has different baseline stances and interests. Germanwatch created the Climate Change Performance Index to encourage efforts toward an effective […] Read more
CCPI Report: “Monitoring Climate Mitigation Efforts of 59 Countries plus the EU” Updated On Wed, Nov 30th, 2022 by Saurenergy A study entitled “Monitoring Climate Mitigation Efforts of 59 Countries plus the EU” has been released by CCPI (Climate Change Performance Index). The invasion of Ukraine by Russia serves as a reminder of how highly dependent most nations still are on fossil fuels. The ability of nations to operate and provide for their inhabitants with […] Read more
Influence of Azimuth and Tilt on Yield of PV System Updated On Wed, Nov 30th, 2022 by Saurenergy Background The tilt and azimuth of a solar panel have a great influence on the energy yield of the overall system. The same panel, at the same installation site, can have different azimuth or tilt. This is a topic we are often asked about so in this Solis seminar, we explore the subject further. About […] Read more
MEP Engineer – Electrical Updated On Tue, Nov 29th, 2022 by Saurenergy Responsibilities:- Assisting in the conducting fieldwork and at times take the lead in this effort. Attending design meetings with the client and issue minutes when the project manager cannot attend or accompany the project manager to meetings. Organizing and directing frequent in-house meetings under the direction of the project manager. Providing input to the project […] Read more