Gujarat Urja Vikas Nigam Ltd (GUVNL) floats tender for 500 MW grid connected Solar Power project Updated On Fri, Jun 16th, 2017 by Saurenergy Gujarat Urja Vikas Nigam Ltd (GUVNL) has decided to buy 500 MW of solar power through competitive bidding, which will be followed by an e-auction for the lowest price. Gujarat Urja Vikas Nigam Ltd via RfS no GUVNL/Competitive/500MW/Solar dated 15.06.2017 has floated tender for procurement of 500 MW power from Solar Power Projects through Competitive […] Read more
Azure Power Taps IBRD (World Bank) Loan to Scale its solar rooftop platform Updated On Fri, Jun 16th, 2017 by Saurenergy The loan is for 15 years with an interest rate of 8.35% per annum, one of the lowest interest rates availed by a solar power developer in the Indian solar sector to date. The loan will be utilized to scale Azure Roof Power, Azure Power’s solar rooftop platform. Azure Power, an independent solar power producer […] Read more
Viz-A-Viz with Xiande Li | Chairman | JinkoSolar Holding Co., Ltd. Updated On Thu, Jun 15th, 2017 by Saurenergy JinkoSolar recently completed financial agreements for 1,177 MW Sweihan PV Power Project in Abu Dhabi, this is not the company’s first participation in a large international bid of the highest level, JinkoSolar has already bagged 250MW project in Mexico and 94MW in Argentina. However, this Abu Dhabi project is of 1.177 GW so what does […] Read more
Waaree Energies commissions 23 MW Solar Power project in Rajasthan Updated On Thu, Jun 15th, 2017 by Saurenergy Waaree will supply power from the solar power plant which spreads across 100 acres at Khetusar in Rajasthan to MSL Plant for 25 years Waaree Energies Ltd. has announced that it has commissioned 23 MW solar power project at Khetusar in Rajasthan. The commissioned solar project is owned by Maharashtra Seamless Ltd. (MSL), a Group […] Read more
Rajasthan invites Japanese companies to invest in solar energy sector in the state Updated On Thu, Jun 15th, 2017 by Saurenergy Vasundhara Raje In her meeting with a delegation of Japan External Trade Organization (JETRO) here, she said solar energy is the power of the future and Rajasthan is the ideal destination for investment in Solar Energy. Rajasthan Chief Minister Vasundhara Raje on Wednesday invited Japanese companies to invest in solar energy sector in the state. […] Read more
Coal India to set up 1000 MW Solar Power Plant: Piyush Goyal Updated On Wed, Jun 14th, 2017 by Saurenergy Coal India Ltd (CIL) will set up 1,000 Megawatt (Mw) solar power plant in a bid to reduce its carbon footprint. The Minister for Coal, Mines and Renewable Energy, Piyush Goyal recently announced that India for the first time became an energy exporter in the year 2016-17. He also said that Coal India Ltd (CIL) […] Read more
Mytrah Energy reports USD 362.23mn in revenue Updated On Wed, Jun 14th, 2017 by Saurenergy The renewable power producer Mytrah Energy entered into PPAs for 140 MW of solar power capacity, bringing the total to 422 MW AC in Telangana, Punjab and Karnataka Renewable energy company Mytrah Energy Ltd. announced its full year results for the year ended 31 December 2016. The company reported full year revenues of USD 362.23mn, […] Read more
GCL-SI Achieves Efficiency of 20.6% for its Multi-crystalline PERC Solar Cells Updated On Wed, Jun 14th, 2017 by Saurenergy “GCL-SI will further advance towards the goal of realizing an average efficiency of 20.5% and a maximum efficiency of PERC solar cells somewhere between 20.8% and 21% in 2017” GCL System Integration Technology Co., Ltd. recently announced that it has achieved efficiency breakthrough of 20.1% for Passivated Emitter Rear Cell (PERC) in mass production by […] Read more
REIL Inviting Bids for 950KWp Grid Connected rooftop Solar PV Power Plant in Jaipur Updated On Wed, Jun 14th, 2017 by Saurenergy The scope of work for REIL’s 950KWp tender includes design, supply, engineering, erection, installation, and commissioning of the rooftop projects. Rajasthan Electronics & Instruments Limited (REIL), Jaipur is inviting bids for Installation- Commissioning & 6 year maintenance of 950 KWp grid connected solar PV power plants at rooftop of various buildings of Rajasthan University, Jaipur […] Read more