ISA Holds Curtain Raiser For 1st World Solar Technology Summit Updated On Mon, Aug 17th, 2020 by Saurenergy The ISA today held a curtain raiser for the first World Solar Technology Summit on September 8. The curtain raiser was a virtual interaction with ISA office bearers. For the Gurugram headquartered ISA, the first Solar Technology Summit is a key event in its mission to make solar the bedrock of future energy generation, and […] Read more
Indian Railways to Pay Rs.27.35 Crores Plus Surcharge to TPC-D Updated On Mon, Aug 17th, 2020 by Saurenergy TPC-D had filed a petition against Indian Railways on non-compliance of the Mid-Term Review Order of MSEDCL The Indian Railways will have to pay more than Rs.27.35 crores to Tata Power Company Limited (Distribution) (TPC-D). The Maharashtra Electricity Regulatory Commission (MERC) has issued an order directing the Indian Railways to pay the outstanding stand-by charges […] Read more
MERC Rejects Grace Period Sought by 28 RE Generators Updated On Mon, Aug 17th, 2020 by Saurenergy Renewable Energy Generators were Seeking Grace Period in Implementation of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations The Maharashtra Electricity Regulatory Commission (MERC) has partially rejected a plea by renewable energy generators in Maharashtra seeking intervention in a matter regarding non-compliance of a MERC order regarding forecasting, scheduling and deviation […] Read more
Peak Power Demand Slumps to 5.65% in August Updated On Mon, Aug 17th, 2020 by Saurenergy The slump in peak power demand has widened to 5.65 percent in the first fortnight of August from 2.61 percent drop recorded in July The slump in peak power demand has widened to 5.65 percent in the first fortnight of August from 2.61 percent drop recorded in July, according to the power ministry data. Peak power demand met, which is […] Read more
Continued Scaling up of Wind Energy is Critical to Jobs: WindEurope Updated On Mon, Aug 17th, 2020 by Saurenergy With the right regulatory framework in place, wind energy promises immediate and lasting jobs creation to spur the EU economy. In its Recovery Strategy, the EU Commission encouraged the Member States to invest in green and future-proof technologies such as wind. With the right regulatory framework in place, wind energy promises immediate and lasting jobs […] Read more
Okaya Power and Prakriti E-mobility to Collaborate on EV Charging Stations Updated On Mon, Aug 17th, 2020 by Saurenergy Okaya Power has formed a strategic partnership with Prakriti E-Mobility to provide well-laid-out EV charging stations for their fleet operations Okaya, a flagship company of Okaya Power Group has announced a strategic partnership with Prakriti E-Mobility Private Limited, India’s largest fleet operators of electric 4W vehicles with the aim to provide well-laid-out Electrical Vehicle (EV) […] Read more
Sterlite Power Drops 14.7% Stake in IndiGrid for Rs 840 Crore Updated On Mon, Aug 17th, 2020 by Saurenergy Sterlite Power has sold 14.7 percent stake it held in India Grid Trust (IndiGrid) for Rs 840 crore to institutional and HNI investors. Sterlite Power, a leading global power transmission player, has announced that it has sold 14.7 percent stake it held in India Grid Trust (IndiGrid) for Rs 840 crore (unit price of Rs 98) to […] Read more
PM Modi Brings 7.5 GW Ladakh Solar Project Back into Focus Updated On Mon, Aug 17th, 2020 by Saurenergy PM Narendra Modi on Saturday during his Independence Day speech reinstated the Centre’s aim to establish a 7.5 GW solar power park in Ladakh Prime Minister Narendra Modi on Saturday during his Independence Day speech reinstated the Centre’s aim to establish a 7.5 GW solar power park in Ladakh to set the union territory on […] Read more
SECI Awards Only 970 MW of 2 GW Wind Tender, Vena and JSW Winners Updated On Mon, Aug 17th, 2020 by Saurenergy SECI recently concluded the auction for its 2 GW ISTS-connected wind projects tender, awarding 970 MW capacity to Vena Energy (L1) and JSW Energy (L2). The Solar Energy Corporation of India (SECI) recently concluded the auction for its 2 GW ISTS-connected wind projects tender. The nodal agency has awarded only 970 MW capacity to the […] Read more