Assistant Manager – Carbon Business Updated On Thu, Jan 2nd, 2025 by Saurenergy Conversant with carbon development process, especially with renewable energy, clean cookstoves, biodigesters, landfill methane capture, plastic recycling, clean water and similar project’s emission reduction computations, GHG accounting, familiarity with various framework of Verra, Gold Standard, GCC and other registry’s methodologies, standards, tools (Including that of CDM’s). You are expected to write PDDs, have fair understanding […] Read more
Mechanical Static Equipment Engineer-Contract Updated On Thu, Jan 2nd, 2025 by Saurenergy Functions as a technical specialist or in a lead role. With minimal supervision, applies advanced engineering techniques and analyses for problems and methods. Expands knowledge and skill set in area of discipline. May start to expand knowledge in other disciplines and/or functional areas. Responsibilities:- Engineering Standards:- Continues to learn, remains current and applies independent knowledge […] Read more
Ladakh To Start Livestock-Grazing Solar Project On Pilot Basis Updated On Thu, Jan 2nd, 2025 by Saurenergy In a recent meeting aimed at building local stakeholders’ confidence in the upcoming mega solar power project at Pang, government officials decided to formalize an action plan to create a pilot solar project in the Pang area of Ladakh. The meeting was held under the chairmanship of Vikram Singh Malik, IAS, Administrative Secretary of the […] Read more
UPNEDA Plans Floating Solar Project On 35 Dams, Issues Tender Updated On Thu, Jan 2nd, 2025 by Saurenergy Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has now issued an Expression of Interest (EOI) from floating solar project developers. The tender is meant to gather information on the feasibility of floating solar power projects in the state and engage with potential developers. The last date for submitting bids under the tender is […] Read more
Site Engineer Updated On Thu, Jan 2nd, 2025 by Saurenergy SafEarth is looking for experienced site engineers to lead deployment of quality solar plants on various sites across the country. The selected candidates will be responsible for leading the on site construction team and monitoring the quality and safety of the work being conducted by them Job Responsibilities:- Leading the site team to ensure that construction […] Read more
SJVN Opens Bids For 18 MW Rooftop Solar Project On Govt Buildings Updated On Thu, Jan 2nd, 2025 by Saurenergy SJVN recently released a tender to select Solar Rooftop Power Developers to set up 18.00 MW grid-connected rooftop solar PV power projects (without battery storage). SJVN is accepting bids until January 20, 2025. This project falls under the “PM Surya Ghar: Muft Bijli Yojana” scheme and will be located on 15 Union Government buildings across […] Read more
Electrical Engineer (TBM) Updated On Mon, Dec 30th, 2024 by Saurenergy Responsibilities: TBM Electrical Systems: Oversee the design, installation, commissioning, and maintenance of all electrical systems on the TBM, including the main drive system, control systems, lighting systems, and communication systems. Develop electrical schematics, wiring diagrams, and control panel layouts. Troubleshoot electrical faults and implement corrective actions. Power Supply and Distribution: Design and implement the power […] Read more
Asst. Manager/Manager – SCM Updated On Mon, Dec 30th, 2024 by Saurenergy Technical skills:- Very Strong knowledge of Procurement of HT / LT Motor, Instrument Panels, Other Electrical Component and Control & Instrumentation components. Should be able to do the detailed Costing of Electrical Components and should do the rate negotiation effectively. Candidates having experience in Thermal Power Plan Equipment / EPC Projects will be preferred. New […] Read more
PM Surya Ghar: 6 Out Of 1736 Vendors In UP Rated A++ Updated On Mon, Dec 30th, 2024 by Saurenergy The Uttar Pradesh New and Renewable Energy Agency (UPNEDA) has released the draft list of empanelled rooftop solar vendors. The list also includes the ratings these vendors received on the National Rooftop Portal based on their installations. The final ratings for vendors will be published monthly, starting in January 2025. UPNEDA reports that the state […] Read more