Electrical Engineer (Auto cad Electrical) Updated On Thu, Sep 30th, 2021 by Saurenergy Use AutoCAD Electrical software to create electrical schematics for automation equipment. Component specification, selection, and integration including motors, controllers, servos, robots, power supplies, circuit breakers, cameras, lasers, filters, and sensors etc. Electrical panel design and layout (2D, 3D). Implement designs that meet standards including UL, NFPA, and CE. Should be self-driven with excellent organizational, problem […] Read more
IT Data Analyst II Updated On Thu, Sep 30th, 2021 by Saurenergy TE Connectivity’s Data Management Analysts are responsible for ensuring optimal data onboarding, ingestion and management processes for new and existing reports or applications. Our Data Management Analysts carry a unique position whereby they are involved in many different types of projects from large scale application development to standardizing reporting streams across businesses. Working as a […] Read more
Sembcorp Raises S$675 M Sustainability-linked Bond, IFC Gives S$150 M Updated On Thu, Sep 30th, 2021 by Saurenergy Sustainable solutions provider Sembcorp Industries has launched a sustainability-linked bond (SLB) in Singapore, raising S$675 million for Pan-Asian energy, marking its latest phase in the transition to a net-zero future. Sembcorp received an investment of S$150 million from IFC, a member of the World Bank Group that is the largest global development institution focused on the […] Read more
Jharkhand Misses Alt Energy Target, Govt Data Shows Updated On Thu, Sep 30th, 2021 by Saurenergy Jharkhand has been a habitual defaulter in meeting the renewable energy purchase obligation (RPO) as mandated by the Centre for achieving the ambitious dream of 175GW power through renewable sources by 2022. RPO is a mechanism by which the obligated entities which includes discoms, open access consumers and captive power producers, are obliged to purchase […] Read more
10.5 GW Solar, Wind and Storage Project in Morocco Updated On Thu, Sep 30th, 2021 by Saurenergy British company Xlinks is developing a 10.5 GW solar-plus-wind project, combined with a battery storage facility, in Morocco, which will supply 3.6 GW renewable energy to the UK via the world’s longest subsea cables. Located in Morocco’s renewable energy rich region of Guelmim Oued Noun, it will cover an approximate area of 1,500km2 and will be […] Read more
Project Engineer Updated On Thu, Sep 30th, 2021 by Saurenergy Configuration and programming of automation and controls systems involving HMI, Process (PLC/DCS) and Process Safety (ICSS/ESD/FGS Development of HMI, SCADA Software for Rockwell Systems or any other Competitors. Design and Engineering of Process Safety PLC Systems / Control Systems for Oil & Gas Industry Ability to handle the project starting from Design till site commissioning. […] Read more
63% of Planned Battery Storage in US to Be Co-Located With Solar Updated On Thu, Sep 30th, 2021 by Saurenergy Of the 14.5 gigawatts (GW) of battery storage power capacity planned to come online in the United States from 2021 to 2024, 9.4 GW (63%) will be co-located with a solar photovoltaic (PV) power plant, based on data reported to us and published in the Annual Electric Generator Report. Another 1.3 GW of battery storage […] Read more
Engagement of Expert / Specialist Updated On Wed, Sep 29th, 2021 by Saurenergy GRSE Ltd. is one of the premier Defence Shipyards enjoying the Mini Ratna, Category – I status and effectively contributing to the defence preparedness of the country by building different sophisticated and state-of-the-art warships. The Company invites applications from qualified, talented and energetic Indian Nationals for the following post of Experts / Specialists on Fixed […] Read more
Supervisor, Planning Updated On Wed, Sep 29th, 2021 by Saurenergy Production planning department is responsible Product BOM Creation and material expedition and ensure the accuracy and timeliness of the production process. Duties include a specific focus on the materials and goods required in the production phase, ensuring the working space is properly maintained to have optimal performance Responsibilities:- Adequate knowledge in production planning and quality […] Read more