Octopus Energy Invests In FFNEV; Eyes Iberia, EU and Latin America Updated On Mon, Dec 26th, 2022 by Saurenergy Octopus Energy – the wind and solar player of the United Kingdom – is bullish on the development of renewable energy in the Iberian Peninsula. The fresh evidence comes from the power generation unit of Octopus Energy investing in renewables energy player FF New Energy Ventures (FFNEV). Octopus Energy held that the investment is aimed […] Read more
ACWA Seals $2.4 Billion Wind Energy PPA With Uzbekistan Updated On Mon, Dec 26th, 2022 by Saurenergy Saudi Arabia-headquartered ACWA Power Company has inked a power purchase agreement (PPA) with the National Electric Grid of Uzbekistan (NEGU) for a value of $2.40 billion. As per the information shared by the ACWA Power in mandatory filing before the Saudi Arabia stock exchange, the deal was inked on 23 December, 2022. According to the […] Read more
Engineer I/ Engineer II Updated On Fri, Dec 23rd, 2022 by Saurenergy Provide engineering support as required for E&D projects mainly New Product Development, Cost Reduction, Quality Improvement and Sustaining Engineering Design and develop system level constructions and/or modifications to meet product design requirements. Coordinate the creation and / or create design models and drawings. Coordinate prototype construction and experimental testing. Assist in the development of qualification test programs. Participate in team meetings and the design verification process. […] Read more
DWSS Floats 8.7 MW of Solar Tender to Power Water Supply Systems in Punjab Updated On Fri, Dec 23rd, 2022 by Saurenergy State-owned Department of Water Supply and Sanitation (DWSS) has invited bids to install 8.7 MW capacity solar projects at 970 rural piped water supply systems in Punjab. The last date for submitting the bid for this DWSS solar tender is January 12, 2023, and the bid will be opened on January 13, 2023. The scope […] Read more
Senior Engineer Updated On Fri, Dec 23rd, 2022 by Saurenergy As a Principal Consultant, the candidate would report to Head of Section-Project Engineering and Due Diligence in India. There could be travel for 20-30% of time within and outside India. Responsibilities:- Providing senior technical oversight and guidance for engineers and team members in all aspects of due diligence process and scope, including technology reviews, site […] Read more
Assessor – Sustainability Updated On Fri, Dec 23rd, 2022 by Saurenergy Sustainability is key business aspect which presents important risks and opportunities for organizations. Robust sustainability performance and responsible business practices are essential to long-term success of organizations, their product and services. DNV is committed in creating a safe and sustainable future. Through our sustainability services, we deliver deep insight and pragmatic support to major companies […] Read more
Ministry of Defence Floats 1.210 MW Solar Tender in Uttar Pradesh Updated On Fri, Dec 23rd, 2022 by Saurenergy The Ministry of Defence has floated a tender for the supply of a 1.210 MW solar power PV plant in various establishments of HAL in Uttar Pradesh under the RESCO model. The last date for submitting the online bid is January 03, 2023, till 06:00 pm and the bid will be opened on the same […] Read more
Scatec India, O2 Power And SJVN Emerge Winners From SECI’s 1.2GW Wind Tender Updated On Fri, Dec 23rd, 2022 by Saurenergy The year end has brought glad news for Scatec India, SJVN and O2 Power, as the three firms emerged with the only allotments from SECI’s 1.2 GW wind energy tender (Tranche XIII) issued in January this year. In terms of actual bids, SJVN was the lowest bidder, having quoted Rs 2.90/unit for a 100 MW […] Read more
Offer Industrialization Leader (OIL) – Power System Updated On Thu, Dec 22nd, 2022 by Saurenergy OIL missions are: Make surethe industrial recommendations are met within the products’ design: Analyze the marketing data and investigate various industrial scenarios to answer Steer product conception choices to solutions which can be industrialized, from preliminary draft to the whole project while focusing on manufacturability, controllability, assembly feasibility, adjustability, testability and on product’s cost optimization. Build […] Read more