Airports Authority of India Sets Net Zero & 100% Green Energy Targets for Airports Updated On Thu, Mar 23rd, 2023 by Saurenergy The Airports Authority of India (AAI) has set the target for most airports in India to become 100% green energy dependent by 2024. Airports are to implement net zero emmission by 2030. Presently Mumbai and Cochin among 25 other airports that are utilising 100% green energy. While Cochin boasts of being the first airport in […] Read more
“Ultimately, Green Hydrogen Will Drive The Biggest Changes In Energy”, John Grimes, SEC Australia Updated On Wed, Mar 22nd, 2023 by Saurenergy John Grimes leads the Smart Energy Council – Australia as its CEO. The council is an independent body that gives an impetus to the renewables sector in Australia by offering energy solutions. In March this year, John led an over 34 member delegation representing over 29 Australian smart energy firms to India. This visit saw […] Read more
Wind Energy Generation to Surge 4-5 Times on Policy Tailwinds: CRISIL Report Updated On Wed, Mar 22nd, 2023 by Saurenergy According to a report by CRISIL, the Ministry of New and Renewable Energy has introduced positive policy changes that could lead to a 6–8 GW annual increase in wind capacity starting in fiscal 2026. This would be four times the growth of 1.6 GW seen in the past five fiscal years, which was driven by […] Read more
APDCL Issues Tender for Selection of Solar Power Developers for 10 MW Solar Projects Updated On Wed, Mar 22nd, 2023 by Saurenergy Assam Power Distribution Company Ltd (APDCL) invited bids for the selection of solar power developers for the development of a 10 MW solar project. The 10 MWAC grid-connected solar PV power projects throughout the State of Assam under CPSU Scheme (Government Producer Scheme) Phase-II, GOI. The bid submission end date is 05.04.2023 at 14:00 Hrs. […] Read more
Goa CM Mulls Over Renewable Energy Expansion to 80 MW to Solarize Panaji Updated On Mon, Mar 20th, 2023 by Saurenergy The state of Goa requires producing 80 MW of renewable energy that may help the state government to make Panaji a solar city. This also needs to be substantiated with the efforts on the part of the people of Goa by installing more and more solar panels, believes Chief Minister of Goa, Pramod Sawant. Out […] Read more
Solar Waste Recycling: An Opportunity For India Updated On Sat, Mar 18th, 2023 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has added the solar modules and solar cells under the e-Waste Management Rules 2022 thereby fixing responsibility of the producers in terms of storing solar industry waste, filing regular returns, disclosing the panel and cell inventory separately and complying with the CPCB guidelines. The move is widely […] Read more
SECI Re-issues Tender for 100 MW Floating Solar at Getalsud Dam, Ranchi Updated On Thu, Mar 16th, 2023 by Saurenergy SECI has invited bids for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) floating solar PV project having 10 years plant O&M at Getalsud Dam, Ranchi, Jharkhand. It’s a global tender. The SECI tender says that the last date for bid submission has been kept on May 2, 2023 and […] Read more
BMC Solicits Bids for Rs 90 cr Loan for Multiple Renewable Energy Projects Updated On Mon, Mar 13th, 2023 by Saurenergy Bhopal Municipal Corporation has issued a tender to invite loans for the installation of 20 MW solar projects (Phase I), 21 MW solar projects (Phase II), 15 MW wind energy projects and 1 MW rooftop solar projects. The bids are invited from nationalized banks, private banks, financial institutions and non-banking financial companies for long-tenure term […] Read more
ALMM Requirement For Solar Projects Deferred To April 2024 Updated On Fri, Mar 10th, 2023 by Saurenergy In a move that was as unexpected as seemingly inevitable, the MNRE(Ministry of New and Renewable Energy), in a late evening Office Memorandum, has declared that its orders for using only domestically approved modules in the Approved list of module manufacturers list (ALMM) will be held in abeyance till March 31, 2024. The ALMM order […] Read more