Andhra Pradesh Solar Energy Policy Updated On Wed, Apr 26th, 2017 by Saurenergy Andhra Pradesh Solar Energy Policy Updates 2017 The state’s renewable purchase obligation (RPO) is set at 9 percent in April 2017 by the Andhra Pradesh Electricity Regulatory Commission (APERC) for the financial year FY2017- 2018. Out of the 9 percent, the 6 percent for the non-solar RPO excluding the large hydro. The RPOs up to […] Read more
Goa Solar Energy Policy Updated On Wed, Apr 26th, 2017 by Saurenergy OBJECTIVE To help India produce Green Power & get involved in Climate Control. To empower the electricity consumer to participate in the development of the Power Sector and to become a producer of electricity while remaining as a Consumer also i.e. be proactively involved in the development of the Power Sector and be a “Prosumer” […] Read more
Rajasthan Solar Energy Policy Updated On Wed, Apr 26th, 2017 by Saurenergy Rajasthan Solar Energy Policy Updates 2017 The new fixed tariff of Rs. 3.93 (~$0.06)/kWh as the generic tariff levelised for 25 years for solar PV projects excluding accelerated depreciation (AD) has been announced by the Rajasthan Electricity Regulatory Commission (RERC) in October 2017. The fixed AD component is fixed at Rs. 0.27 (~$0.004)/kWh making the […] Read more
Madhya Pradesh Solar Energy Policy Updated On Wed, Apr 26th, 2017 by Saurenergy Madhya Pradesh Solar Energy Policy Updates 2017 The payment guarantee to be provided to solar project developers in the Rewa Ultra Mega Solar (RUMS) park approved the state cabinet of the Government of Madhya Pradesh in September 2017. OBJECTIVE The objectives of the Madhya Pradesh Solar Energy Policy are as follows: To encourage participation of […] Read more
Gujarat Solar Energy Policy Updated On Wed, Apr 26th, 2017 by Saurenergy Gujarat Solar Energy Policy Updates 2017 The 50 percent cap of the approved load or contracted demand by small residential rooftop owners has been removed by the government of Gujarat enabling the residential consumers to install rooftop solar systems of any capacity of their own. The order came in effect from April 13, 2017. The […] Read more
Solar Power Tariff Expected to Get Cheaper than Coal Updated On Mon, Apr 24th, 2017 by Saurenergy The solar power tariff has seen a significant decline in tariffs from Rs. 10.95-12.76/kWh in 2010-11 to as low as Rs. 3.15 per kWh, which is expected to fall to Rs. 2.90 per unit. India’s solar power prices may be set to fall below those of thermal (coal) energy. This is based on an expected […] Read more
SunPower to Supply Equipment Solutions to Global Solar Power Plant Market Updated On Mon, Apr 24th, 2017 by Saurenergy “The SunPower Oasis platform delivers competitive cost of energy with the proven reliability and quality of SunPower technology in a fully pre-engineered complete solution” SunPower has announced that it now offers the fully-integrated SunPower Oasis Power Plant platform directly to solar power plant developers and engineering, procurement and construction (EPC) providers through a newly formed […] Read more
Utility Scale O&M Practices Updated On Thu, Apr 20th, 2017 by Saurenergy India has been moving ahead aggressively with an ambitious programme to reach an installed capacity of 100GW solar power by 2022. Many states are setting up Multi-megawatt solar power installations to herald the arrival of the renewable energy generation. Solar Power Plants are built to last 25 years or more. However, after the Engineering Procurement […] Read more
Solar Cell-Process, Position and Bazaar Updated On Wed, Apr 19th, 2017 by Saurenergy Solar cell or photovoltaic (PV) cell is a semiconductor material, which combines some properties of both metals and insulators making it uniquely capable of converting light into electricity. When light is absorbed by a semiconductor, photons of light can transfer their energy to electrons, allowing the electrons to flow through the material as electrical current. […] Read more