RUMSL Issues Tender For 600MW Solar Project With BESS Updated On Thu, Sep 26th, 2024 by Saurenergy The Rewa Ultra Mega Solar Limited (RUMSL) has now issued a tender seeking developers to develop a 600 MW of solar project with battery energy storage (BESS). RUMSL, formed in 2015 is a Joint Venture between Madhya Pradesh UrjaVikas Nigam Limited (MPUVN), and Solar Energy Corporation of India (SECI). As per the tender details, RUMSL […] Read more
NHPC Issues Tender For 1.2 GW Solar Project With ESS Updated On Mon, Sep 23rd, 2024 by Saurenergy NHPC Limited has now issued a tender seeking solar power generators for setting up of 1.2 GW solar power projects with 600MW/1200MWh (ESS) on anywhere in India. The company said that this project will be setup under an Inter-State Transmission System (ISTS) transmission network. It also said that the bidders will get a Green Shoe […] Read more
CEA Approves 2.5 GW Of PSP Projects In Maharashtra Updated On Mon, Sep 23rd, 2024 by Saurenergy The Central Electricity Authority (CEA) has announced concurring two more Pumped Storage Projects (PSPs) in Maharashtra namely-1500 MW Bhavali PSP being developed by JSW Energy Ltd. and 1000 MW Bhivpuri PSP being developed by Tata Power Co. Ltd. These PSPs are concurred with the support of the Central Water Commission (CWC), Geological Survey of India […] Read more
EPIC Owner – Services & Connectivity Updated On Fri, Sep 20th, 2024 by Saurenergy The mission for the Epic owner is to define the EPIC by working collaboratively with stakeholders and cater to Services & Connectivity stream deliveries. You will manage interfaces with other Vehicle and Technology streams as well to coordinate the cross functional deliverables (E.g., operation, after market, back office, ..) Our core epic solving teams consists […] Read more
Cygni, HiNa To Bring India-Specific Sodium-ion Energy Solutions Updated On Tue, Sep 17th, 2024 by Saurenergy Cygni Energy Private Limited, a Hyderabad-based energy storage solutions player has planned to collaborate with HiNa to develop India-specific Sodium-ion based storage solutions. This storage solution is cheaper, safer, and allows 20-minute charging. Cygni Energy has been an advocate of Sodium-ion-based solutions and a challenger to Lithium for specific applications. As part of this partnership, […] Read more
H1: Global Wind Turbine Orders Hit 91.2 GW, India Orders Rise 69% YoY Updated On Tue, Sep 17th, 2024 by Saurenergy Globally, the wind turbine order intake reached a new high in H1, with the addition of 91.2 GW. This is a 23 percent increase year-over-year (YOY). According to a new analysis from Wood Mackenzie, this took the global investment by developers in H1 to US$ 42 billion, a 3% increase YOY. Whereas, the developers in […] Read more
System Design Engineer Updated On Tue, Sep 17th, 2024 by Saurenergy Roles & Responsibilities:- In-house drawings and technical specifications for electrical works (BOM, BOQ, RFP) Design & Drawing of electrical systems for medium and large-scale PV systems (DC, AC, LV, HV, communication systems/SCADA, Earthing, Lightning protection and Illumination Calculation). Preparation of Design Documents such as RFP, GTP etc. Preparation of drawing for various projects such as […] Read more
SJVN Invites Bids For 600 MW/2,400 MWh ESS Across India Updated On Mon, Sep 16th, 2024 by Saurenergy SJVN, in coordination with the Renewable Energy Implementation Agency (REIA), has released a 1.2 GW tender for solar plus energy storage. The tender invites bids from Solar Power Developers (SPDs) to set up ISTS-connected Solar PV Power Projects with 600 MW/2,400 MWh Energy Storage Systems (ESS) anywhere in India under Tariff-Based Competitive Bidding on a […] Read more
UPNEDA Issues Tender For 320 MW Of Solar Project At Jalaun Updated On Mon, Sep 16th, 2024 by Saurenergy The Uttar Pradesh New and Renewable Energy Agency (UPNEDA) has issued a new tender inviting developers to establish 320 MW of solar power projects in Jalaun, Uttar Pradesh. The project will be developed under a Build, Own, and Operate (BOO) model, according to UPNEDA. The state nodal agency will also provide the required land on […] Read more