SUBSCRIBE NEWS LETTER

PV systems

Punjab Policy on Net Metering for Grid Interactive Roof-Top Solar PV Power Plants

Scope and Application:- (1) This Policy shall apply to the distribution licensee and consumers of distribution licensee of the State of Punjab. (2) The eligible consumer may install the rooftop solar system under net metering arrangement which; (a) shall be within the permissible rated capacity as defined under this Policy. (b) shall be located in […]

Read more

President assents Continuation Of Phase 3 of Off-Grid and Decentralized Solar PV Applications Programme

The funds for Solar PV application implementation would be met from Plan allocation made during financial years 2018-19 onward with an overall Plan Outlay of Rs. 656 Crores. After the cabinet approved the continuation of Off-grid and Decentralized Solar PV Applications Programme – Phase III in financial year 2018-19, the President’s assent has deemed the continuation […]

Read more

Nashik Municipal Corporation Buildings to get Solar Power Systems soon

Nashik Municipal Corporation has already issued the letter of award to the contractor for installing solar panels at 16 government buildings. Under the ‘Smart City’ scheme, Nashik Municipal Corporation (NMC) approves the tender for installing rooftop solar panels at various government buildings. Moreover, NMC has already issued the letter of award to the contractor for […]

Read more

Introduction to Floating PV Plant

Renewable energy sources are of prime importance as they would power our future. Solar energy power plant which utilises the sun’s energy needs adequate space for installation. It is a well-known fact that out of the 510 million Km2 surface area of earth, a mere (appx.) 29% is covered with land. Additionally (at some locations) […]

Read more

ADB to Provide $45.4 Mn to Spur Off-Grid SPV Pumping for Irrigation in Bangladesh

ADB grant will help in replacing diesel systems with solar powered irrigation to enhance energy security, reduce local pollution, and mitigate climate change. The project is also expected to result in a reduction of 17,261 tons of carbon dioxide emissions annually.   The Asian Development Bank (ADB) will provide USD 20 million loan to Bangladesh […]

Read more

Cabinet Okays Continuation of Off-grid, Decentralised Solar PV Applications Programme

The total project of the 3 components included under the phase-III is Rs 1,895 crore of which Rs 637 crore will be provided as central financial assistance. The government has provided its consent for implementing phase-III of off-grid and decentralized solar PV application programme to achieve additional 118 MWp (Mega Watt peak) off-grid solar PV […]

Read more

Cabinet approves Continuation of Off-grid and Decentralised Solar PV Applications Programme – Phase III

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi has given its approval for implementation of Phase-Ill of Off-grid and Decentralised Solar PV (Photo Voltaic) Application Programme to achieve additional 118 MWp(Mega Watt peak) off-grid solar PV capacity by 2020. Phase-Ill of Off-grid and Decentralised Solar PV Application Programme covers […]

Read more

Govt Brings National Policy for Wind-Solar PV Hybrid Projects

A scheme for new hybrid projects under the policy is also expected shortly. The government has issued a new national wind-solar hybrid policy aiming to provide framework for promotion of large grid connected wind-solar PV hybrid system for efficient utilization of transmission infrastructure and land. The Ministry of New and Renewable Energy (MNRE) also said […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll