Design Engineer-Solar PV Plant Design Updated On Sat, Mar 6th, 2021 by Saurenergy Experience: Minimum 2-3 years of experience, preferably in the area of power generation system design and project management. Qualification: BE/ Diploma – Electrical Location: Pune Key Responsibilities / Accountabilities: Create plans for solar energy system development, monitoring, and evaluation activities. Prepare detailed work plans. Conduct engineering site audits to collect structural, electrical, and related site […] Read more
O&M Engineer-Solar PV Plant Updated On Sat, Mar 6th, 2021 by Saurenergy Experience: Minimum 3 years of experience, preferably in the area of Solar PV Power plants and projects. Qualification: BE/ Diploma – Electrical, Electrical preferable Location: Pune Key Responsibilities / Accountabilities: Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as […] Read more
O&M Technician-Solar PV Plant Updated On Fri, Mar 5th, 2021 by Saurenergy Experience Minimum 2-3 years of experience, preferably in the area of Solar PV Power plants and projects. Qualification ITI Electrical, Electrical preferable Location Pune KEY RESPONSIBILITIES/ACCOUNTABILITIES Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as assigned to perform all […] Read more
Sun Technicians : Solar PV Utility &/or RoofTop Updated On Thu, Mar 4th, 2021 by Saurenergy Experience Minimum 1 year of experience on-ground. Qualification ITI – Electrical Key Responsibilities / Accountability Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as assigned to perform all aspects of on-site operations & maintenance and breakdown maintenance activities, modifications as […] Read more
Sun Engineers : Solar PV Utility &/or RoofTop Updated On Thu, Mar 4th, 2021 by Saurenergy Key Responsibilities / Accountability Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as assigned to perform all aspects of on-site installation, repair, maintenance, oversight, and modifications as required Work directly with client personnel and, as directed, third-party vendors to […] Read more
Solis Recommends Anti-Grid Surger in Solar Systems Updated On Mon, Feb 22nd, 2021 by Saurenergy Solis recommends anti-grid surger in solar houses. Installation of multistage surge protection device (SPD), used with the correct SPD wiring method for different grid systems and high quality grid-tied inverters ensures the prevention of any unwanted discharge to facilities. Solis will promote the culture of anti- grid surge protection for residences and C&I roof that […] Read more
Leading PV Inverter Brands to Launch Products Compatible With 210 Ultra-High Power Modules Updated On Mon, Feb 8th, 2021 by Saurenergy The world’s leading photovoltaic inverter brands have announced the market launch of inverters compatible with the 210 Ultra-High Power Modules. Mass production of the inverters is due to begin in March 2021, and the price is expected to remain at a level compatible with that of other types of inverters. The full launch of inverters […] Read more
Saving Your Rooftop PV Plant From a Lighting Strike Updated On Sat, Jan 9th, 2021 by Saurenergy Background Residential PV systems are generally installed on the rooftop of residential buildings, with a large metal surface area, higher distance from the ground and exposed location. That makes these PV systems a possible target for lightning during thunderstorms. Thus, having good lightning protection and grounding becomes key to avoid any incidents that could cause […] Read more
Gurudwaras to Have Solar Systems, As SGPC Wants Cheap Electricity Updated On Wed, Jan 6th, 2021 by Saurenergy The Shiromani Gurdwara Parbandhak Committee (SGPC) has yesterday announced to install solar systems at historic gurdwaras to reduce the cost of electricity. The solar-generated electricity would be drawn for the preparation of ‘langar’ by steam. SGPC chief Bibi Jagir Kaur told in an interim meeting, that solar systems would be installed at gurdwaras, and a […] Read more