Solar Dc Design Engineer Updated On Mon, Apr 18th, 2022 by Saurenergy As a Design Engineer (Electrical – DC), the person shall be capable of preparing, reviewing & executing Engineering Activities for Solar Power Plants as per the direction of Design Lead (Electrical – DC ). He must have good knowledge in DC SLD, over all Layout in Solar PV Power Plants. He shall facilitate the modellers […] Read more
Century PlyBoard Goes with GoodWe For 2.8 MW Solar Project Updated On Wed, Apr 13th, 2022 by Saurenergy Century Plyboard Industries Limited, a leading plyboard manufacturer has gone with GoodWe’s HT-250KW inverters for its solar plant at the manufacturing site in Hoshiarpur, Punjab. The inverters will power a 2.8 MW capacity plant that will serve the needs of the factory. For Century, a manufacturer, seller and exporter of plywoods, laminates, doors, PVCs and […] Read more
Goodwe-HT-250KW*10 inverters commissioned at Century Plyboard Industries Ltd Updated On Wed, Apr 13th, 2022 by Saurenergy Chinese solar PV inverters manufacturer GoodWe has partnered with Century Plyboards Ltd., an Indian manufacturer, seller and exporter of plywoods, laminates, doors, PVCs and veneers, to help the latter contribute to environmental longevity and enhance its renewable footprint. Century Plyboards (India) Ltd. offers plywood products under the brand name Century Ply and exports its range of products to over […] Read more
Oriano Clean Energy to Develop 40MWp Solar Power Projects for Shree Cement Updated On Tue, Apr 12th, 2022 by Saurenergy Mumbai based clean tech company Oriano Clean Energy Private Limited has announced that it has secured an order from Rajasthan based Shree Cement Limited (SCL) to develop about 40 MWp of solar power projects under Captive Open Access Mechanism. The contract is specifically for the building of solar PV projects of 30 MWp (2 x […] Read more
Electrical Designer Updated On Thu, Apr 7th, 2022 by Saurenergy Responsibilities:- Develop a deep understanding for the Fluence energy storage technology platforms Draws plans for electrical layouts, equipment installation and other construction for BESS and substation. Take the lead in identifying and evaluating proposals from BOP contractors to support system integration General Electrical Equipment Layouts including Sub-Station Layouts Equipment installation drawings including civil foundations Design […] Read more
Gautam Solar Introduces ‘Gel Battery’ for Better Storage Across Sectors Updated On Thu, Apr 7th, 2022 by Saurenergy Gautam Solar has launched a new Gel Battery for domestic and international markets to address the need for energy storage for solar power plants, electric vehicles, telecom and rural electrification. Gautam Solar says that its Gel Batteries are cost -effective, thermally stable, long lasting and sealed maintenance free with no topping up ever required. Gautam […] Read more
Rajasthan HC dismisses PIL against land allotment to solar companies Updated On Wed, Apr 6th, 2022 by Saurenergy Rajasthan High Court has dismissed a PIL protesting land allotment to solar companies in Fatehgarh area and imposed a penalty of Rs 50,000 on the petitioners. A division bench comprising Justice Vinod Bharvani and Justice Sandeep Mehta issued an order on March 31 and dismissed the PIL and directed the petitioners to deposit the penalty […] Read more
CERC Adopts Tariff for SECI’s Manufacturing Linked Solar Tenders Updated On Mon, Apr 4th, 2022 by Saurenergy The Central Electricity Regulatory Commission (CERC) has accepted Solar Energy Corporation of India Limited’s (SECI) request for the adoption of tariff for 8800 MW of solar power plants connected to inter-state transmission system (ISTS) linked with setting-up of solar manufacturing plant, selected through competitive bidding process as per the official guidelines issued by Ministry of […] Read more
Jetsar Solar Project Completely Operationalised by NTPC Updated On Mon, Apr 4th, 2022 by Saurenergy National Thermal Power Corporation Limited (NTPC) – the largest state owned power producer in the country – has announced that its Jetsar Solar PV Project located in Sri Ganganagar district of Rajasthan is now completely commercially operational. The electricity produced from the solar farm was supplied to the grid system in March end. NTPC said, […] Read more