Prabhakar Kadapa Joins Etrio’s Board of Directors Updated On Wed, Apr 20th, 2022 by Saurenergy Hyderabad-headquartered EV-maker Etrio Automobiles Pvt. Ltd. has announced that Prabhakar Kadapa, a veteran automotive leader with over 39+ years of industry experience, has joined its Board of Directors. Kadapa served most recently as the CEO & Managing Director at PSA AVTEC Powertrain Pvt. Ltd. (a JV of PSA Groupe, France and CK Birla Group) as […] Read more
Masdar Signs Agreement with Kyrgyzstan to Develop 1GW Renewable Projects Updated On Wed, Apr 20th, 2022 by Saurenergy The Central Asian economies are looking to diversify their energy basket in order to reduce their carbon emissions and reduce dependence on fossil fuels which are mostly imported. In the latest development, United Arab Emirates based clean energy company Masdar has signed a memorandum of understanding (MoU) with the Ministry of Energy of Kyrgyzstan in […] Read more
Solar project commissioned by Nestle, Yellow Door in Dubai Updated On Tue, Apr 19th, 2022 by Saurenergy Nestlé Pure Life and Yellow Door Energy have commissioned a solar power plant at Nestle’s facility in Dubai, United Arab Emirates (UAE). The project is designed to generate 2,400 megawatt-hours (MWh) of renewable energy. It is possibly part of the 7 MW capacity solar project announced by Nestle in 2017 at its manufacturing facilities in […] Read more
THDC, Rajasthan Govt Sign Agreement to Develop 10,000 MW Solar Projects Updated On Mon, Apr 18th, 2022 by Saurenergy THDC India Limited has signed an agreement in Rishikesh with Renewable Energy Corporation Limited (RECL) for the development of large solar power projects with combined capacity of 10,000 MW in Rajasthan. With one of the highest solar irradiance in India, Rajasthan has been catching up aggressively in fresh solar capacity as well as planned capacity in […] Read more
Lead Engineer – WRA Updated On Mon, Apr 18th, 2022 by Saurenergy Wind and Site evaluation is a critical step in the Wind Power Plant Sales and Development process for Vestas. The Lead Siting Solutions Engineer will act as the Siting point of contact for all Indian Sales projects. This will involve scoping and reviewing all Siting work performed for Sales projects in the country. At the […] Read more
Solar Dc Design Engineer Updated On Mon, Apr 18th, 2022 by Saurenergy As a Design Engineer (Electrical – DC), the person shall be capable of preparing, reviewing & executing Engineering Activities for Solar Power Plants as per the direction of Design Lead (Electrical – DC ). He must have good knowledge in DC SLD, over all Layout in Solar PV Power Plants. He shall facilitate the modellers […] Read more
Century PlyBoard Goes with GoodWe For 2.8 MW Solar Project Updated On Wed, Apr 13th, 2022 by Saurenergy Century Plyboard Industries Limited, a leading plyboard manufacturer has gone with GoodWe’s HT-250KW inverters for its solar plant at the manufacturing site in Hoshiarpur, Punjab. The inverters will power a 2.8 MW capacity plant that will serve the needs of the factory. For Century, a manufacturer, seller and exporter of plywoods, laminates, doors, PVCs and […] Read more
Goodwe-HT-250KW*10 inverters commissioned at Century Plyboard Industries Ltd Updated On Wed, Apr 13th, 2022 by Saurenergy Chinese solar PV inverters manufacturer GoodWe has partnered with Century Plyboards Ltd., an Indian manufacturer, seller and exporter of plywoods, laminates, doors, PVCs and veneers, to help the latter contribute to environmental longevity and enhance its renewable footprint. Century Plyboards (India) Ltd. offers plywood products under the brand name Century Ply and exports its range of products to over […] Read more
Oriano Clean Energy to Develop 40MWp Solar Power Projects for Shree Cement Updated On Tue, Apr 12th, 2022 by Saurenergy Mumbai based clean tech company Oriano Clean Energy Private Limited has announced that it has secured an order from Rajasthan based Shree Cement Limited (SCL) to develop about 40 MWp of solar power projects under Captive Open Access Mechanism. The contract is specifically for the building of solar PV projects of 30 MWp (2 x […] Read more