Jharkhand: DVC Opens Bid To Build 234 MW Floating Solar Project Updated On Tue, Dec 3rd, 2024 by Saurenergy Damodar Valley Corporation (DVC) recently released a tender to build a 234 MW grid-tied floating solar PV (FSPV) plant. This project is located on DVC’s Maithon Dam Reservoir at Maithon Jharkhand. The project included a 10-year comprehensive Operations and Maintenance (O&M). The last date for bid submission is 7th January 2025. The DVC tender said […] Read more
Waaree Energies Bags 364 MWp & 160 MWp Module Supply Orders Updated On Mon, Dec 2nd, 2024 by Saurenergy Indian solar module manufacturer Waaree Energies today announced securing orders for module supply totaling 364 MWp and 160 MWp. The firm received these orders from renewable project developers from India. These customers are engaged in the business of owning, developing and operating renewable power projects in India, the firm said. The contracts include the supply […] Read more
Powergrid Seeks Bids To Build Solar Powered Green H2 In Rajasthan Updated On Fri, Nov 29th, 2024 by Saurenergy Powergrid recently released a tender to develop a transmission and distribution pilot project. The tender provides Package GH2-01 for the establishment of a solar PV-powered Green Hydrogen plant and a fuel cell-based microgrid pilot project. This project is located at the 400/220/33kV Neemrana substation in Rajasthan and includes Operation and Management (O&M) for 10 years. […] Read more
Honda To Offer Activa Electric With Swappable Batteries, Bookings From Jan Updated On Thu, Nov 28th, 2024 by Saurenergy The electric version of Honda’s Activa model will be available for booking from January 2025, the company said. Honda Motorcycle & Scooter India (HMSI) has now ushered into the next era of mobility with the introduction of ‘ACTIVA e:’ and ‘QC1’ in the electric vehicle segment. The unveiling of the Activa brand in an all-new […] Read more
Brazil Installed Solar Capacity Touches 50 GW In 2024 Updated On Thu, Nov 28th, 2024 by Saurenergy Brazil’s solar installed capacity recently reached 50 GW according to new data from the Brazilian Photovoltaic Solar Energy Association (ABSOLAR). Of the cumulative capacity, the country secured 33.5 GW from distributed generation and 16.5 GW from utility-scale projects, The country now sources more than 95% of the capacity released this year from renewable sources. With […] Read more
COVER STORY: India Eyes Historic Rise Of Solar Cell Manufacturers Updated On Thu, Nov 28th, 2024 by Saurenergy So far, 2024 has been a remarkable year for the Indian solar industry. Not only has it met expectations so far in terms of capacity additions, it has also delivered a huge fillip to the rooftop solar sector, thanks to PM Surya Ghar and new momentum in promising schemes like PM-KUSUM, besides record additions in […] Read more
NTPC, Chhattisgarh Genco To Build 2 GW Renewable Energy Projects Updated On Wed, Nov 27th, 2024 by Saurenergy NTPC recently signed a Memorandum of Understanding (MoU) with Chhattisgarh State Power Generation Co. Ltd. (CSPGCL) to develop up to 2 GW of renewable energy projects, including floating solar projects. To initiate the creation of this project, Chief Engineer (CP & BD) of CSPGCL, G. K. Gupta, and General Manager (Engineering) of NGEL, D. Joshi, […] Read more
Telangana Issues Tender For 1 GW Of Rooftop Solar Projects Updated On Tue, Nov 26th, 2024 by Saurenergy The Telangana State Renewable Energy Development Corporation Limited (TSREDCO) has now issued a tender for rooftop solar projects. Through this tender, the state has planned to add 1 GW of new rooftop solar capacity. The move comes as the state plays catch up on renewable capacity, considering the limited options to add large, utility scale […] Read more
Waaree Energies Bags 600 MW Solar Module Order Updated On Tue, Nov 26th, 2024 by Saurenergy Waaree Energies, the module manufacturing arm of the Waaree Group today announced bagging a 600 MW solar module order. The company in its filing before the exchanges informed its investors about the new order. The delivery of these modules is scheduled to begin in FY 2025-26, the firm said. This contract involves the supply of […] Read more