SECI Extends Bid Deadline for 50 MW Solar Tender in Tamil Nadu, Again Updated On Thu, May 20th, 2021 by Saurenergy SECI has extended the bid submission deadline for its tender for 50 MW solar PV projects with land having 10 years plant O&M at Tamil Nadu. The Solar Energy Corporation of India (SECI) has extended the bid submission deadline for its tender for the design, engineering, supply, construction, erection, testing and commissioning of 50 MW […] Read more
Solar MGR Updated On Mon, May 17th, 2021 by Saurenergy Dimensions parts or elements for a technical solution as to the requirements and related to a specific technical field. Checks the possibilities for technical realization regarding the requirements. Drafts the technical realization of the requirements within the technical discipline. Dimensions elements, components or software by calculation or by their specification according to the requirements and, […] Read more
SECI Extends Deadline for 50 MW Solar Tender in Tamil Nadu Updated On Tue, May 4th, 2021 by Saurenergy SECI has extended the bid submission deadline for 50 MW solar PV project with land having 10 years plant O&M at Tamil Nadu. The Solar Energy Corporation of India (SECI) has extended the bid submission deadline for its tender for the design, engineering, supply, construction, erection, testing and commissioning of 50 MW (AC) solar PV […] Read more
ReNew Power to use Robotic Cleaning Solutions From Airtouch Solar Updated On Wed, Apr 28th, 2021 by Saurenergy Airtouch Solar will supply its water-free robotic cleaning systems for three of ReNew Power’s new solar plants in Rajasthan, India. Israel-based clean solutions providers for solar systems Airtouch Solar (Airtouch) has announced that it has signed contracts for the supply of its water-free robotic cleaning systems for application on three of ReNew Power’s new solar […] Read more
AM/Manager – Civil & Structural Updated On Mon, Apr 26th, 2021 by Saurenergy Eden Renewables India is currently offering a unique position as AM – Civil & Structural within the Engineering Department where you will be playing a fundamental role within a team of highly-skilled and experienced professionals. With an embedded culture of diversity and team spirit, Eden Renewables India is striving to get the most-suited working environment […] Read more
Canadian Solar Starts Mass Production of 210 mm Large Cell Modules of up to 665 W Updated On Tue, Apr 13th, 2021 by Saurenergy Canadian Solar Inc. today announced that it has started mass production of high-power, high-efficiency modules with power output of up to 665 W. The new generation of monofacial HiKu7 and bifacial BiHiKu7 modules are based on 210 mm cells and are set to deliver one of the most competitive levelized cost of electricity (LCOE) in the industry by reducing […] Read more
SECI Extends Bid Deadline for 50 MW Tamil Nadu Solar Tender Again Updated On Wed, Apr 7th, 2021 by Saurenergy SECI has extended the bid deadline for its tender for commissioning of 50 MW solar project with land having 10 years plant O&M at Tamil Nadu The Solar Energy Corporation of India (SECI) has extended the bid submission deadline for its tender for the design, engineering, supply, construction, erection, testing and commissioning of 50 MW […] Read more
Solis Seminar Episode 16: Leakage Current Failure Updated On Sat, Apr 3rd, 2021 by Saurenergy Background In the last episode of the Solis Seminar series we talked about how faults can occur during wet weather, in particular the importance of “PV Isolation Protection”. In this episode, we will discuss “leakage current failure” faults and cover possible causes as well as ways to prevent the issue. We will look at a […] Read more
Solar Firms Almost Unanimous on 10 kW Rule for Net-Metering – It’s a Disaster Updated On Wed, Mar 24th, 2021 by Saurenergy While industry reaction to the new rules from the Ministry of Power that mandates net metering upto a limit of 10 kW only have been well reported, we decided to speak to installers across states to get a broader view. What we see is a very clear divide between a vast number of smaller installers, […] Read more