Deadline for 20 MW Solar Plus 20 MW Storage Tender in Leh Extended. Again. Updated On Thu, Feb 25th, 2021 by Saurenergy SECI has extended the bid submission deadline for its tender for the commissioning of a 20 MW solar with 20 MW storage project in Leh, Ladakh. Keeping up with its recent trend, the Solar Energy Corporation of India (SECI) has notified the extension in bid submission deadline for another tender. This time it has extended […] Read more
JinkoSolar to Partner With Tongwei, Secures Solar Glass From Flat Glass Updated On Tue, Feb 23rd, 2021 by Saurenergy JinkoSolar, one of the largest and most innovative solar module manufacturers in the world, has announced that the Company intends to sign a “strategic cooperation agreement” with Tongwei to jointly invest in a high-purity crystalline silicon project with annual capacity of 45,000 metric tons and a silicon wafer project with an annual production capacity of […] Read more
WAAREE Commissions 16 MW Solar Project in Maharashtra Under Agri-feeder Scheme Updated On Sat, Feb 20th, 2021 by Saurenergy Indian solar module manufacturer WAAREE has announced the commissioning of a 16 MW ground-mounted solar project in Gavhankund, Maharashtra. The project was executed for Waacox Energy Pvt. Ltd. under the Agri feeder scheme of Maharashtra Govt for Maharashtra State Power Generation Co. Ltd. (MAHAGENCO). The new plant has developed under the support of the Chief Minister’s […] Read more
O&M Engineer Updated On Fri, Feb 19th, 2021 by Saurenergy The O&M Engineer will be responsible to data analysis of daily, weekly and monthly activities to ensure smooth operations for both rooftop & ground mounted plants. The O&M Engineer shall have the responsibility of monitoring the performance of solar power plants on a day-to-day basis and must be available for immediate field trips in case of […] Read more
Technical Engineer Updated On Fri, Feb 19th, 2021 by Saurenergy Assemble solar modules , panels , or support structures , as specified. Install active solar systems , including solar collectors , concentrators , pumps. Perform routine photovoltaic (PV) system maintenance on modules , arrays , batteries , power conditioning equipment , safety systems , structural systems , weather sealing , or balance of systems equipment. […] Read more
Tigo Energy Crosses Threshold of 75 GWh of Cumulative Reclaimed Energy Updated On Thu, Feb 18th, 2021 by Saurenergy Performance improvement demonstrated in over 18,000 installations for installers like Project Solar UK Tigo Energy, Inc., the solar industry worldwide leader in Flex MLPE (Module Level Power Electronics), announced today that the company has surpassed 75 GWh of Reclaimed Energy since 2009 for worldwide installations utilizing the company’s industry-leading optimization solutions. Reclaimed Energy is the […] Read more
Ashok Leyland Running 60% of Countrywide Operations With Clean Energy Updated On Thu, Feb 18th, 2021 by Saurenergy Ashok Leyland has announced that it has increased the sourcing of clean energy to 60 percent for its countrywide operations. Ashok Leyland, the flagship commercial vehicle manufacturer of the Hinduja Group has announced that it has increased the sourcing of clean energy to 60 percent for its countrywide operations. The firm has detailed that now […] Read more
Solis Holds 1st Technical Seminar with 1 GW Celebration in Ahmedabad Updated On Tue, Feb 16th, 2021 by Saurenergy Ginlong (Solis) Technologies, held its first technical seminar of 2021 in Ahmedabad, India at Hyatt Regency on February 12, 2021. Solis organized the event to update and share information of its new technology that are coming up in India and its recent milestone of cross 1 GW shipments. Solis entered India in 2015, and has […] Read more
Tiger Pro Ensures the Perfect Combination of System Safety and Economy Updated On Mon, Feb 15th, 2021 by Saurenergy According to customs statistics, in 2020 JinkoSolar’s shipment volume in India jumped to the top. It is reported that JinkoSolar recently signed a large project in India with the two largest local EPC companies to deploy nearly 500MW of Tiger Pro high-efficiency modules. With high power generation, excellent system compatibility, convenient installation methods and lower […] Read more