DGTR’s Third Anti Dumping Investigation. Too Little, Too Late? Updated On Tue, May 18th, 2021 by Saurenergy The announcement by the ministry of commerce and industry of the Directorate General of Trade Remedies (DGTR) starting an anti-dumping probe on imports of solar cells imported from China, Vietnam, and Thailand was made yesterday. The move, while following due process as one would hope, leads to several questions regarding its relevance. Perhaps the only […] Read more
Associate Manager – Operations & Maintenance Updated On Fri, May 14th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
MNRE’s New Scheme Guidelines for 12,000 MW CPSU Phase-II Project Updated On Tue, May 11th, 2021 by Saurenergy The ministry of new and renewable energy (MNRE) has released the newly amended scheme guidelines for implementation of Central Public Sector Undertaking (CPSU) Scheme Phase-II (Government Producer Scheme) for setting up 12,000 MW grid-connected Solar PV power projects by the Government Producers. These 12,000 MW projects will be produced by the government producers with Viability […] Read more
LONGi Wins at “All Quality Matters” Solar Congress 2021 Updated On Mon, May 10th, 2021 by Saurenergy China-based leading solar PV manufacturer LONGi announced today that it has once again received recognition at the 2021 edition of the TÜV Rheinland “All Quality Matters” Solar Congress, with its Hi-MO 4 and Hi-MO 5 high-efficiency modules winning awards for PV Module Outdoor Energy Yield (Monofacial Group) and PV Module Energy Yield Simulation (Bifacial monocrystalline […] Read more
Senior Engineer – Operations & Maintenance Updated On Mon, May 10th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Barcelona Develops Solar Pavement at a Historic Square Updated On Mon, May 3rd, 2021 by Saurenergy The Barcelona City Council recently revealed that it is funding the development of a 50-square-meter pilot project at Plaça de Les Glòries Catalanes, a historical square, for testing the feasibility of PV-paving technology which will be supplied by Spain’s Sorigué and Hungary-based Plati. The project won the municipal challenge ‘Generator pavements’, which sought innovative solutions for generating […] Read more
LONGi Clarifies: Didn’t End Contracts With Indian Power Developers Updated On Fri, Apr 23rd, 2021 by Saurenergy In response to recent reports suggesting that Chinese PV manufacturer LONGi, among other solar developers, had withdrawn from signed contracts with Indian power developers due to increasing commodity prices, the company issued a clarification stating that this information being passed around was false and that no such contracts had been terminated. The company claims that […] Read more
Gautam Solar Increases Solar Manufacturing Capacity From 120 MW to 250 MW in India Updated On Fri, Apr 23rd, 2021 by Saurenergy Gautam Solar has more than doubled its solar panel manufacturing capacity from 120 MW to 250 MW at its facility in Haridwar. Gautam Solar, one of the leading solar manufacturers in the country, has announced that it has more than doubled its solar panel manufacturing capacity from 120 MW to 250 MW at its facility […] Read more
Solar O&M Gets Set For The Big League In India Updated On Mon, Apr 19th, 2021 by Saurenergy As India’s solar footprint has grown, from a tentative 3.7 GW in 2015 to over 40 GW now, a little appreciated, but growing opportunity is finally getting its place in the sun too. The Solar Operations and Maintainance (O&M) business. A $4 billion business worldwide in 2019, it is set to be a $9 billion […] Read more