4 Winners in NTPC’s 1.2 GW Solar Tender, Winning Bid at Rs 2.43/kWh Updated On Fri, Aug 7th, 2020 by Saurenergy NTPC Ltd has concluded the e-reverse auction for its 1.2 GW solar tender awarding capacity to 4 winners in O2 Power, Tata Power, Azure Power, and AMP Energy NTPC Ltd has concluded the e-reverse auction for its tender for the selection of solar power developers for setting up 1.2 GW ISTS-Connected solar PV power projects […] Read more
MoP Extends ISTS Charges Waiver for Solar & Wind Projects Until 2023 Updated On Fri, Aug 7th, 2020 by Saurenergy MoP has extended the waiver of ISTS charges and losses on the supply of power generated from solar and wind power projects until June 30, 2023. The Ministry of Power (MoP) has notified that it has extended the waiver of inter-state transmission system (ISTS) charges and losses on the supply of power generated from solar and wind […] Read more
5 Reasons Why Rooftop Solar Needs to Make The Technology Jump Updated On Tue, Aug 4th, 2020 by Saurenergy Pick Smart India’s ambitious solar targets of 100 GW by 2022, and 450 GW by 2030, are largely built around massive ramp ups in large scale deployments, or ‘utility scale’ solar. These comprise designated solar parks, even ultra large parks, and other hundred MW plus installations that will feed into the grid directly. But the […] Read more
The same duties on imports of cells & modules are not going to serve the purpose: Prasoon Chaudhary Updated On Mon, Aug 3rd, 2020 by Saurenergy In a chat with Prasoon Chaudhary, Business Unit Head, Photovoltaic Solar Manufacturing at Pennar Industries Limited, we got his perspective on the many challenges the module side of the business faces today. After their success in the mounting structures business, the engineering goods firm is looking ahead to replicating the same level of success in […] Read more
The Solar Foundation: Solar Structures Need Attention Updated On Wed, Jul 29th, 2020 by Saurenergy As India’s solar march has gone on, from 2 GW to a possible 42 GW by the end of this year, it’s interesting to see just what got the headlines within the sector. It has undoubtedly been modules, cells and inverters, in that order. What has been missed out is in fact, as important. Yes, […] Read more
MNRE Extends RE Research and Technology Development Programme Updated On Wed, Jul 29th, 2020 by Saurenergy MNRE has announced the continuation of its Renewable Energy (RE) Research and Technology Development Programme till March 31, 2021 The Ministry of New and Renewable Energy (MNRE) has announced that its as received the sanction from the president of India for the continuation of its Renewable Energy (RE) Research and Technology Development Programme till March […] Read more
MNRE Offers 6 Months Extension for Self Certification of Solar Inverters Updated On Mon, Jul 27th, 2020 by Saurenergy MNRE has extended the deadline for the self-certification of inverters for PV applications in the country by a period of 6 months, to December 31, 2020. The Ministry of New and Renewable Energy (MNRE) has announced that it has extended the deadline for the self-certification of inverters for PV applications in the country by a […] Read more
Axpo Subsidiary Urbasolar to Build 37 new Solar Plants in France Updated On Sat, Jul 25th, 2020 by Saurenergy Axpo Holding has announced that its subsidiary Urbasolar is accelerating its growth in France by developing 37 new solar plants across 16 French departments Swiss utility Axpo Holding has announced that its subsidiary Urbasolar is accelerating its growth in France by developing 37 new solar plants across 16 French departments in collaboration with French bank […] Read more
Vikram Solar Signs MoU to set up 3 GW Manufacturing Facility in Tamil Nadu Updated On Wed, Jul 22nd, 2020 by Saurenergy Vikram Solar intends to set up a 3 GW solar manufacturing facility in Tamil Nadu, after it signed a Memorandum of Understanding with the state government. Kolkata-based solar energy module manufacturer and solutions provider – Vikram Solar has announced that it is planning to set up a 3-gigawatt (GW) solar manufacturing facility in Tamil Nadu, after it […] Read more