India Must Develop Domestic Manufacturing Hub Of Photovoltaic Modules: Khuba Updated On Fri, Jul 29th, 2022 by Saurenergy Turning the tables on foreign countries, India has to develop its own domestic market into a manufacturing hub for photovoltaic modules and make other countries traders of solar components under the Aatmanirbhar initiative, Bhagwanth Khuba, Minister of State for New and Renewable Energy, said in New Delhi on July 28. “So far India was dependent […] Read more
500GW of Energy Storage Will Be Globally Available By 2031: Wood Mackenzie Updated On Thu, Jul 28th, 2022 by Saurenergy UK-based data provider Wood Mackenzie has released its Global Energy Storage Outlook today. According to this report, market growth for global energy storage has been uneven, with cumulative storage deployments anticipated to reach 500GW by 2031. Only 159-gigawatt hours (GWh) are projected for the region by 2031, compared to 422 GWh for China and 600 […] Read more
Filatex India Signs PPA To Purchase Renewable Energy Updated On Thu, Jul 28th, 2022 by Saurenergy Filatex India Ltd, has signed a PPA with FP Crysta Energy Pvt Ltd and an SHA with FPEL Sunrise Pvt Ltd. The agreements have been signed under Gujarat’s Hybrid Wind-Solar Power Policy 2018 to mitigate the cost of energy from the grid that has constantly been on the rise and while also keeping in mind […] Read more
The Rise Of Solar Fires Sound A Cautionary Note Updated On Tue, Jul 26th, 2022 by Saurenergy A recent study by Firetrace International, a global provider of fire suppression technology, has indicated that solar farm fires are seeing a sharp rise. The report, titled, “Hidden Danger – why solar farm fire risk could be greater than you think,” shares that the industry could possibly be misjudging the threat of fire. It has […] Read more
Control Engineer – Electrical & Renewable Updated On Tue, Jul 26th, 2022 by Saurenergy Engineer will be directly responsible for Power Plant controls engineering for renewable energy i.e. Solar, Wind, Microgrid projects Engage in understanding the engineering drawings to prepare and study technical data,Specification requirements for renewable energy (Solar, Wind, Hybrid) power plants. Engage in Controls application engineering and testing phases of renewable energy including Solar, BESS, Wind power […] Read more
Power Electronics Engineer Updated On Mon, Jul 25th, 2022 by Saurenergy Responsibilities:- Determine detailed technical requirements for inverters while participating in an Agile product development process Review inverter technical documentation to determine compliance with requirements and evaluate technical characteristics Verify inverter functionality and performance characteristics by testing at Fluence’s own testing facilities and or supplier facilities Develop a deep understanding of inverter operations and provide guidance […] Read more
Samsung SDI Pumps In $1.3 Billion For Cylindrical Battery Facility In Malaysia Updated On Fri, Jul 22nd, 2022 by Saurenergy Global conglomerate Samsung SDI has announced that it will invest $1.3 billion in setting up of cylindrical battery lines in Malaysia by the end of this decade to realize its ambition to become a global top tier company. A novel ceremony was held for the construction of a second battery production unit in Seremban, Malaysia. […] Read more
China’s Solar Power Installations Touch Record High Of 31 GW In First Half Of 2022 Updated On Fri, Jul 22nd, 2022 by Saurenergy Installing solar power projects at breakneck speed, China built nearly 31 GW from January to June 2022. This is 137% more than last year during the same period. This trend, unless stopped midway, is extrapolated to clock between 75 GW and 90 GW by the end of this year. According to Wang Bohua, the honorary […] Read more
Recruitment of experienced professionals on fixed term basis in the area of Renewable Energy Updated On Thu, Jul 21st, 2022 by Saurenergy NTPC Limited is India’s largest integrated power company with installed capacity of 69,134 MW and has presence in the entire value chain of the power generation business. Commensurate with our country’s growth challenges, NTPC has embarked upon an ambitious plan to attain a total installed capacity of 130 GW by 2032. NTPC is looking for […] Read more