Pem Solar Updated On Thu, Dec 1st, 2022 by Saurenergy As a Project Engineering Manager, the person shall ensure that the engineering activities of the project takes place within stipulated time (w.r.t. both quality & cost). She / He shall ensure the adherence to L2 schedule during execution of the project. She / He shall work on optimizations / alternate proposals / solutions for quick […] Read more
Solar Ac Design Lead Updated On Thu, Dec 1st, 2022 by Saurenergy The person shall be responsible for the complete design and detailed engineering for Solar Power plants like Mini Grid and Mega watt scales plants ,roof top plants . The Design Lead shall manage and review the entire design documents and drawings for a project or a set of smaller projects including co-ordination with other […] Read more
Rajasthan Opens PM-KUSUM Online Land Registration Portal Updated On Tue, Nov 29th, 2022 by Saurenergy Under Component C of the Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabhiyan (PM-KUSUM), Rajasthan has created the Saur Krishi Ajivika Yojna (SKAY) to encourage the development of decentralised solar projects at load centers with primarily agricultural usage in rural areas. By enabling farmers and landowners to lease out their unused or unproductive land on […] Read more
Free Solar Power Plant for 800 Houses in Kerala by KSEB Updated On Mon, Nov 28th, 2022 by Saurenergy In an announcement that might set a precedent for other Indian states to follow, the Kerala State Electricity Board (KSEB) will install rooftop solar power plants for 800 homes in Kerala. The breakup of this number will compose of 500 homes for the homeless as per the Life Mission Scheme. The remaining 300 will be […] Read more
Solar Is Changing Fast, Here Are 5 Ways It Already Has Updated On Mon, Nov 28th, 2022 by Saurenergy When the Jawaharlal Nehru National Solar Mission was launched back in January 2010, India had a total installed solar capacity of around 160 MW. The mission itself had a target of 20 GW by 2022. However, changes on the ground in terms of technology, availability and fresh climate realities meant a wholesale upgrade on those […] Read more
Trainee Engineer-I / Project Engineer-I Updated On Tue, Nov 22nd, 2022 by Saurenergy Bharat Electronics Limited, a Navratna Company and India’s premier professional Electronics Company under the Ministry of Defence, requires the following personnel on Contract basis for Kotdwara Unit for its various projects locations all over India POST DISCIPLINE WISE NO. OF POSTS UPPER AGE LIMIT AS ON 15.12.2022 CONSOLIDATED REMUNERATION PER MONTH […] Read more
Project Engineer-I and Trainee Engineer-I Updated On Tue, Nov 22nd, 2022 by Saurenergy Bharat Electronics Limited, a Navratna Company and India’s Premier Professional Electronics Company under Ministry of Defence, requires the following personnel on temporary basis for its Machilipatnam Unit: 1. REQUIREMENT OF PROJECT/ TRAINEE ENGINEERS:- Post code Name of the post No. of posts Upper age limit as on 01.10.2022* Minimum post qualification experience […] Read more
Engagement Of Experienced Personnel On Contract Basis Updated On Mon, Nov 21st, 2022 by Saurenergy POWERGRID, a ‘Maharatna’ Public Sector Enterprise under the Ministry of Power, Govt. of India is engaged in power transmission business with the mandate for planning, co-ordination, supervision and control over complete Inter-State Transmission System and operation of national & regional power grids. Government of India (GOI) has launched Revamped Distribution Sector Reform Scheme (RDSS) scheme […] Read more
Lead Design Engineer – Piping Layout Updated On Mon, Nov 14th, 2022 by Saurenergy Provide the scheme to designer for the preparation of Equipment Layout and Piping layout Calculate the MTO and SOQ Piping related Spec preparation Checking of Isometrics drawings and guide the designer for the preparation of nozzle orientation Review the stress study result and share the strength with civil team Review the alignment with other disciplines […] Read more