Senior Project Lead Engineer Updated On Mon, Dec 6th, 2021 by Saurenergy As a Senior Project Lead Engineer, reporting to the Engineering Manager in Process Automation Business Area ,you will be responsible for coordinating engineering discipline across several projects, providing technical support for testing, installation and commissioning activities and you will assist in preparing proposal/presentation of engineering projects/programs (provision of bills of materials, estimated engineering hours, etc.). […] Read more
Engagement of Lead Consultant Updated On Mon, Dec 6th, 2021 by Saurenergy Bharat Heavy Electricals Limited (BHEL), India’s premier engineering and manufacturing enterprise provides World class products and services and caters to core sectors of the Indian economy viz., Power Generation and Transmission, Renewable Energy, Defence, Aerospace, Oil & Gas with over 180 product offerings to meet the needs of these sectors. With a widespread network of […] Read more
Engagement of Senior Consultant in Finance in BHEL Updated On Mon, Dec 6th, 2021 by Saurenergy Bharat Heavy Electricals Limited (BHEL), India’s premier engineering and manufacturing enterprise provides World class products and services and caters to core sectors of the Indian economy viz., Power Generation and Transmission, Renewable Energy, Defence, Aerospace, Oil & Gas with over 180 product offerings to meet the needs of these sectors. With a widespread network of […] Read more
Optimising Solar PV Power Supply Systems Alongside Oil Generators Updated On Wed, Dec 1st, 2021 by Saurenergy Background In some areas of the world, the power grid can fail or shut down due to unstable supply or planned shutdowns via programs such as “load shedding” and can last an unknown amount of time. During this time, a standard grid connected solar PV system will also shut down. How can we ensure that […] Read more
Solar Pump Mfr Shakti Pumps to Make Motors, Chargers for EVs Updated On Wed, Dec 1st, 2021 by Saurenergy Shakti Pumps India on Tuesday (Nov 30) said it is making a foray into the manufacturing of motors, chargers, controllers and drives for electric vehicles, through a wholly-owned subsidiary. The company’s board recently approved the incorporation of a wholly-owned subsidiary to make a foray into the EV segment with the manufacturing of motors, chargers, controllers […] Read more
Senior Project Lead Engineer Updated On Mon, Nov 29th, 2021 by Saurenergy As a Senior Project Lead Engineer, reporting to the Engineering Manager in Process Automation Business Area ,you will be responsible for coordinating engineering discipline across several projects, providing technical support for testing, installation and commissioning activities and you will assist in preparing proposal/presentation of engineering projects/programs (provision of bills of materials, estimated engineering hours, etc.). […] Read more
System Engineer-Protection & Automation Design Updated On Fri, Nov 26th, 2021 by Saurenergy System Engineer (Protection & Automation Design) will be responsible for Design of Protection and Substation Automation System used for various voltage levels in India and Abroad. The incumbent will be responsible for different project of phases like Understanding the client requirement, Preparation of detail design/documentation, Preparation of load calculations, Approval of design/documentations from customer. Understand […] Read more
Gadkari Bats For Ethanol, Green Hydrogen At Wind Conference Updated On Fri, Nov 26th, 2021 by Saurenergy At the World Wind Energy Conference 2021 (WWEC2021) being held at New Delhi, Union Minister for Road Transport and Highways, Nitin Gadkari, stressed on the need to see ethanol and Green hydrogen make an impact in the transportation sector to make a real impact. Pointing out that only 6% of the energy consumption in the […] Read more
Power Ministry Issues Order Extending ISTS Benefits to BESS, Pumped Storage Projects Updated On Thu, Nov 25th, 2021 by Saurenergy In an order dated November 23, the Ministry of Power of the Government of India has notified key changes to its existing orders allowing waiver of ISTS (Inter State Transmission Charges) on Wind and Solar Sources. In the latest version, for Wind, Solar, Hydro PSP (Pumped Storage Projects) and BESS projects commissioned upto 30.06.2025, the […] Read more