MP Solar Developer Directed to Pay Up To CTUIL By APTEL Updated On Mon, Dec 23rd, 2024 by Saurenergy In an appeal taken all the way to APTEL by SEI Sunshine Power Pvt. Ltd. and its group companies against the Central Electricity Regulatory Commission (CERC), the apex regulator went with the latter in directing the firm to pay up as directed by CERC earlier. The amount involved is Rs 18.25 crores approx. Issue: The […] Read more
Senior Mechanical Project Engineer Updated On Thu, Dec 19th, 2024 by Saurenergy Responsibilities:- Advise and reviews projects in the sales phase (compliancy check) Translate and optimize the as sold functionality to a working mechanical design within the budget available in co-operation with other disciplines (LLC, HLC, Installation etc.) Identify specials (DAR process) and coordinate design with SDE (responsible for end product) Coordinate steelwork design Integrate design rules […] Read more
Assistant Manager CAD (CIVIL -SOLAR PROJECTS ONLY)) Updated On Thu, Dec 19th, 2024 by Saurenergy Responsibilities:- India and Overseas site visits during various phases of the project (pre-bid, construction, Operation and Maintenance) and prepare site visit report, site feasibility assessment and remedial measures for Solar PV plant as per requirement. Review preliminary investigation reports, Geo-technical, topography, hydrology and prepare executive summary from the reports and shall propose best suitable solution […] Read more
News In Brief Dec 19: RWE’s 10 GW Milestone, Exide Picks Honeywell, Envision’s Storage Win Updated On Thu, Dec 19th, 2024 by Saurenergy RWE Owned, Operated Clean Generation Assets Reaches 10 GW In US RWE, a leading global energy company, has reached significant growth in the U.S. after hitting 10 gigawatts (GW) of installed generation capacity of onshore wind, solar, and energy storage facilities in operation from coast to coast. The company owns and operates a diverse portfolio of more than […] Read more
91,194 Tribal Households Electrified Under RDSS Scheme: Minister Updated On Thu, Dec 19th, 2024 by Saurenergy The latest data shared by Shripad Naik, Minister of State (MoS) for New and Renewable Energy, revealed that 91,194 Particularly Vulnerable Tribal Groups (PVTG) households have been electrified to date under the Revamped Distribution Sector Scheme (RDSS). This data includes the electrification of households under the state plan in three states, namely Gujarat, Odisha, and […] Read more
The Impact of EVs on Auto Insurance and Risk Management Updated On Thu, Dec 19th, 2024 by Saurenergy With rapidly growing footprints, electric vehicles (EVs) are fast becoming a preferred choice of customers across the globe. Consequently, their wider adoption is resulting in critical implications for the auto industry. Especially for insurance and risk management professionals, the popularity of EVs warrants a comprehensive makeover of their existing policies. So, what are key areas […] Read more
Prozeal, Kintech & SAEL Secure GUVNL’s 500 MW Solar Auction Updated On Thu, Dec 19th, 2024 by Saurenergy GUVNL recently announced seven winners of its 500 MW grid-connected solar power projects with an additional 500 MW greenshoe option. Under its Phase XXV auction, it allocated bids to S.B.B. Mouldings, Kintech Synergy, Enertech Fuel Solutions, Prozeal Green Energy, Ausom Enterprise, Drashta Green Power, and SAEL Industries. The tender for this project was released in […] Read more
Falling Module Prices Trigger 13% Drop In EU Solar Investments: Report Updated On Wed, Dec 18th, 2024 by Saurenergy SolarPower Europe’s latest report highlights the addition of 65.5 GW of solar capacity in the region. Despite a yearly growth of 4.4%, this year’s growth marks the lowest market growth since 2017. However, the slowdown was anticipated following the exceptional surge in 2022 and 2023. The growth during that period was largely driven by soaring […] Read more
Punjab: Gensol Secures 22 MW Solar Project From A Steel Firm Updated On Wed, Dec 18th, 2024 by Saurenergy Indian renewable energy company Gensol Engineering Limited today announced securing the first large turnkey solar project from a steel product company in Punjab. The project involves the development of a 22 MW ground-mounted solar PV power plant, with a total contract value of INR 88 Crore is set to be executed over a 6-month period. […] Read more