Assistant Vice President – O&M Updated On Wed, Jan 24th, 2024 by Saurenergy Key Accountabilities / Responsibilities:- Lead the O&M function achieve operational excellence and setting up of O&M processes for ensuring high reliability and minimal downtime of operational assets Implement best practices to maximize the operational efficiency and safety of the assets. Implementing Emergency Restoration systems to manage and respond to emergencies, coordinating with on-site teams and […] Read more
MNRE Simplifies Rooftop Solar Installation Process, Issues New Notification Updated On Fri, Jan 12th, 2024 by Saurenergy In the latest notification, the Ministry of New and Renewable Energy (MNRE) tried to simplify the application process for grid-connected rooftop solar. The latest notification issued by the ministry has asked the discoms to ask their consumers for fewer documents to install rooftop solar. Meanwhile, the ministry has also listed the documents needed to be […] Read more
Govt Extends Benefits To Open Access Consumers, Notifies New Rule Updated On Fri, Jan 12th, 2024 by Saurenergy The Ministry of Power has amended its Electricity (Second Amendment) Rules 2023 and inserted new provisions to regulate the sector. These new provisions are related to the rules related to the General Network Access (GNA) and Open Access Consumers in the country. In its newly amended rules, the ministry talked about the additional surcharge for open access […] Read more
Top 12 Trends Of 2023 That Created Ripples In Indian Renewable Sector Updated On Tue, Jan 2nd, 2024 by Saurenergy For India, forming a backdrop to the whole year was the softening in global module prices, continuation of ALMM exemptions, and of course, the noise around carbon credits and green hydrogen. Which events actually made an impact? Which ones stood out and are most likely to make a real impact, and soon? We present below […] Read more
43 Pumped Hydro Storage Projects With 55 GW Capacity Under Survey: Govt Updated On Wed, Dec 27th, 2023 by Saurenergy Union Power Minister R.K Singh in a written reply before the Parliament stated that a total of 43 Pumped Hydro Storage Projects (PSPs) are under survey and investigation in the country. He mentioned that these projects have an aggregate installed capacity of 55,085 MW. The minister also said that a total of four PSPs are […] Read more
NTPC REL Wins 900 MW in PFCCL 1250 MW Solar Tender Updated On Tue, Dec 26th, 2023 by Saurenergy PFCCL has announced the winners for its solar tender released a few months ago. NTPC Renewable Energy Limited has secured the bid for 900 MW capacity in the solar tender floated by PFCCL on behalf of NTPC Ltd. for the selection of 1250 MW ISTS-connected solar PV power projects in India under Flexibility Scheme. The […] Read more
No Need For Feasibility Reports For Rooftop Solar Below 10kw: Draft Rule Updated On Thu, Dec 21st, 2023 by Saurenergy The Ministry of Power, in its latest draft notification, has proposed amending the electricity rules for rooftop solar. As per the latest draft rule, the authorities will remove the requirement to undertake technical feasibility studies for rooftop solar projects below 10 kilowatts (KW). The new draft rules, named Electricity (Rights of Consumers Second Amendment) Rules […] Read more
MERC Rejects MEDA’s Plea For 50% Local RE Procurement By Discoms Updated On Tue, Dec 19th, 2023 by Saurenergy The Maharashtra Energy Development Agency had filed a petition with the Maharashtra Electricity Regulatory Commission (MERC) asking it to issue appropriate directions to distribution licensees (discoms) to meet 50% of total Renewable Purchase Obligation (RPO) requirement by purchase of energy from Renewable Sources within the State. Maharashtra has achieved installed capacity of 10,799 MW as […] Read more
Andhra Biggest Beneficiary Under Energy Efficient Public Lighting Updated On Mon, Dec 18th, 2023 by Saurenergy Andhra Pradesh is the biggest beneficiary of Union government’s energy efficiency scheme for public lighting through LEDs, data shared by the New and Renewable Energy Minister RK Singh before the Parliament revealed. The ministry in his written response before the Lower House of the Parliament (Lok Sabha) submitted state-wise details of coverage under the scheme. […] Read more