SUBSCRIBE NEWS LETTER

Ministry of Power

REC Raises $500 Mn Through Green Bonds

REC Limited, a state-owned infrastructure company has raised $500 million through 5-year green bonds as part of its $10 billion Global Medium-Term Program. REC plans to use these funds to finance eligible green energy projects that qualify under its green finance framework. REC a ‘Maharatna’ company under the administrative control of the Ministry of Power, […]

Read more

Govt Releases Revised Guidelines For EV Charging Stations

The Ministry of Power has now issued a revised guidelines for setting up electric vehicle (EV) charging stations at private, public and restricted areas. The fresh norms talked about a ceiling in the tariffs of EV charging stations, maximum service charges from consumers during solar and non-solar hours. The new rules also touched upon the […]

Read more

Maharashtra Discom Issues Green Energy Open Access Norms

The Maharashtra State Electricity Distribution Company Limited (MSEDCL) has now issued guidelines for the roll out of green energy open access in the state. This comes after the Maharashtra Electricity Regulatory Commission had notified its MERC (Distributed Open Access) (Second Amendment) Regulations 2023. The latest regulation allows consumers with contracted demand of 100 kw or […]

Read more

GERC Declines To Impose Charges For Rooftop Solar Users

The Gujarat Electricity Regulatory Commission (GERC) in its latest order declined to impose new charges on solar rooftop consumers. This came to the light when some stakeholders demanded imposing system strengthening charges from rooftop solar users. The demand included imposing system strengthening charges from consumers having capacities below 6Kw. The matter was raised during the […]

Read more

PGCIL Gets 20 GW Bhadla-III Transmission Project From RECPDCL

Power Grid Corporation of India Limited (PGCIL) recently acquired Bhadla-III Power Transmission Limited, a project-specific Special Purpose Vehicle (SPV) established to develop an additional transmission system to evacuate power from Bhadla-III PS. This project is part of the Rajasthan REZ Phase-III Scheme (20 GW) on a build, own, operate, and transfer (BOOT) basis, managed by […]

Read more

NTPC Issues 1.2 GW Hybrid Tender With 600 MW Greenshoe Option

NTPC has released a tender to select hybrid power generators for the supply of 1.2 GW of power from inter-state (ISTS)-connected wind-solar hybrid power projects anywhere in India. This project has a greenshoe option for an additional capacity of up to 600 MW on a Build-Own-Operate (BOO) basis with 20th of September set as the […]

Read more

Draft Norms: MoP Proposes Timeline Of 66 Months For PSPs

The Ministry of Power (MoP) has now issued draft guidelines for the issuance of tenders related to Pumped Storage Projects (PSPs). The new proposed norms mandate that the on-river PSPs need to commence its operations after 66 months after the signing of the Power Purchase Agreement (PPA).  For the off-river projects, the developers need to […]

Read more

EESL, ADB Come Together To Train New Women EV Drivers

Energy Efficiency Services Limited (EESL), a joint venture of public sector undertakings under the Ministry of Power announced the successful completion of the training program of more than 200 women drivers who have been equipped with professional driving skills in the passenger transport and the logistic sector. This also included specialized training on driving electric […]

Read more

Extreme Temperatures: CEA Issues Clarifications To Wind Companies

The Central Electricity Authority (CEA) has issued clarifications for the wind power companies related to their compliance with the norms related to extreme temperatures. This clarification came to the forth after the Wind Power Producers Association (WIPPA) approached the Ministry of Power.  The association had earlier apprised the ministry about the hurdles in obtaining Connectivity […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll