Recruitment of Trainee Engineer (Civil Mechanical & Electrical) Trainee Officer (Finance) & Trainee Officer (Company Secretary) Updated On Fri, Dec 24th, 2021 by Saurenergy NHPC, a premier Schedule – A, ‘Mini Ratna’ Company with 70.95% owned by Government of India is the biggest hydropower company in India and a leader in design, construction and operation of hydropower plants. NHPC has so far commissioned 22 Hydro Power Projects, 01 Wind Power Project & 01 Solar Power Project with an installed […] Read more
Recruitment of Assistant Law Officers at E0 Level through CLAT-2021 Updated On Wed, Dec 22nd, 2021 by Saurenergy QUALIFICATION:- Bachelor Degree in Law (LLB or equivalent – full time degree from recognized Indian university/institute) with minimum 60% marks (55% for SC/PWD candidates). Candidates should be registered with the Bar Council. AGE LIMIT:- Upper age limit is 30 years as on last date of online application in NTPC. SELECTION PROCESS:- Eligible candidates must have […] Read more
Recruitment of HR Executive and Public Relations Officer Updated On Tue, Dec 21st, 2021 by Saurenergy ONGC has always been at the forefront to ensure energy security of the nation. We are thus on a lookout for young, energetic and promising talent for work centres in India and abroad. The intended recruitment in Executive level posts in HR and CC disciplines, through UGC NET — June 2020 score, were notified vide […] Read more
Engineer – Drainage (Microdrainage) Updated On Fri, Dec 17th, 2021 by Saurenergy Able to carry out civil engineering design like hydraulic calculations/analysis, Civil general arrangement drawings, pipe longitudinal sections, specifications, BOQs, prepare and review tenders, detailed design/engineering of water and wastewater networks as per industry/client standards. Has good experience of leading and delivering multi-disciplinary projects and can co-ordinate effectively with other disciplines. Familiarity with relevant standards and […] Read more
Recruitment of Trainee Engineers / Project Engineers Updated On Mon, Dec 13th, 2021 by Saurenergy Bharat Electronics Limited, a Navratna Company and India’s Premier Professional Electronics Company under Ministry of Defence, requires the following personnel on contract basis for its Hyderabad Unit. 1. REQUIREMENT OF ENGINEERS:- Sl. No. Post Post Code No. of Posts Upper age limit as on 31.12.2021 * […] Read more
Recruitment of Project Engineer – I – Machilipatnam Unit Updated On Fri, Dec 10th, 2021 by Saurenergy Bharat Electronics Limited, a Navratna Company and India’s Premier Professional Electronics Company under Ministry of Defence, requires the following personnel on contract basis for its Machilipatnam Unit: 1. REQUIREMENT OF PROJECT ENGINEERS- I Post code Name of the post No. of posts Upper age limit as on 01.11.2021* Minimum post qualification […] Read more
Recruitment of workpersons for various permanent post(s) Updated On Wed, Dec 1st, 2021 by Saurenergy Oil India Limited (OIL), a Navratna Public Sector Undertaking is the pioneer and second largest national upstream Oil and Gas Company with a pan India presence and growing global footprint. OIL is set to conquer newer horizons of all-round growth and excellence. It is engaged in exploration, production and transportation of crude oil, natural gas […] Read more
Recruitment for the post of Senior Engineer (E-III) and Deputy Manager (E-IV) Updated On Tue, Nov 30th, 2021 by Saurenergy Bharat Electronics Limited a Navartna Company and India’s premier professional electronics Company under the Ministry of Defence, requires the following personnel on permanent basis for its Strategic Communication and Unmanned Systems SBU, Bengaluru Complex. Sl. No. Post Qualification / Discipline Reservation Upper Age Limit (as on 01.11.202 1) […] Read more
Recruitment of Sr. Executive (Corporate Communication) & Executive (IT Developer) Updated On Tue, Nov 30th, 2021 by Saurenergy NTPC Limited is India’s largest integrated energy company with installed capacity of 67907 MW and has presence in the entire value chain of the power generation business. Commensurate with our country’s growth challenges, NTPC has embarked upon an ambitious plan to attain a total installed capacity of 130 GW by 2032. NTPC is looking for […] Read more