SUBSCRIBE NEWS LETTER

LONGI

LONGi Green Energy Technology’s Revenue Nearly Doubled in 2016

LONGi Green Energy Technology’s noticeable improvement in performance is due to the company’s successful effort in breaking free from traditional business model of relying solely on solar wafer, and adding module business to drive revenue growth said the company LONGi Green Energy’s 2016 financial results show that the company posted RMB11.531 billion in revenue, an […]

Read more

India-US might come over the longing WTO Dispute

PM Narendra Modi is giving consistent effort to strengthen political and trade relations with the US. The bilateral relations has significantly effected 3-year old WTO dispute; as latest reports asserts to rejig the domestic content requirement in India’s solar power programme. India and the US are talking over this issue and leaders from both the […]

Read more

91,194 Tribal Households Electrified Under RDSS Scheme: Minister

The latest data shared by Shripad Naik, Minister of State (MoS) for New and Renewable Energy, revealed that 91,194 Particularly Vulnerable Tribal Groups (PVTG) households have been electrified to date under the Revamped Distribution Sector Scheme (RDSS). This data includes the electrification of households under the state plan in three states, namely Gujarat, Odisha, and […]

Read more

Cheap Solar and Expensive Power- Pakistan’s Sobering Experience So far

Readers will be aware that we have occasionally tracked the growth of solar in Pakistan here. What has been interesting is the fact that the country, while performing poorly at an institutional level, has seen the kind of solar boom that would rival almost any country elsewhere over the past year and more. Reports claim […]

Read more

5 Challenges That Can Increase Solar Module Costs In India

The Indian solar module manufacturing sector, once heavily reliant on Chinese imports for solar modules and cells, is gradually moving toward self-reliance. However, this transition brings its own set of hurdles, which could lead to increased costs for solar panels and project development, potentially pushing solar tariffs higher in the coming years. 1. Reduced Export […]

Read more

Fixed Tenure Engineers

Bharat Electronics Limited, a Navaratna and India’s premier Professional Electronics Company requires the following Engineers for its Bangalore only Complex and other Project sites on Fixed Tenure basis for a period 05 Years (Extendable upto 02 Years):       DETAILS OF POSTS, MINIMUM ELGIBILITY CRITERIA and PLACE OF POSTING:- Post Code Post Discipline / […]

Read more

Senior Field Operation Engineer/Field Operation Engineer/Project Engineer-I/Trainee Engineer-I

Bharat Electronics Limited a Navartna Company and India’s premier professional electronics Company under the Ministry of Defence, requires the following personnel on temporary basis for HLS&SCB SBU for its project at Uttar Pradesh location.   S. No.   Role No of Post   Qualification / Discipline Post Qualification Experience as on 01.10.2024   Reserva tion […]

Read more

Desert Technologies To Build 3 GW Cell, 2 GW Module Facility In Saudi Arabia

Jeddah-based Desert Technologies, which already operates a PV assembly line in Saudi Arabia with an annual capacity of 110 MW for high-efficiency PERC monocrystalline modules (up to 540Wp power output) has announced a major expansion plan. With an annual nameplate capacity of 5GW, the firm plans a 3GW solar cell manufacturing capacity and a 2GW […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll