Geotab Study On EV batteries Underscores Second Life Potential Updated On Tue, Dec 10th, 2024 by Saurenergy Battery degradation is a natural process that reduces the amount of energy a battery can store or the power it can deliver. In electric vehicles (EVs), however, power degradation is rarely noticeable because the battery’s power output often exceeds the vehicle’s requirements, as found in a research paper by Geotab, a global market transportation solutions […] Read more
SECI’s 9.29 GW Of Renewable Projects Still Await Buyers Updated On Tue, Dec 3rd, 2024 by Saurenergy The growth in tendering for utility-scale projects marks the progress within the renewable energy sector. Recent data shared by the Solar Energy Corporation of India (SECI) indicated a list of renewable projects that are yet to see buyers. As per the prescribed practice, the renewable project developers who win tenders through SECI tie up with […] Read more
NVVN’s 500MWh Storage Tender Breaks New Ground With Record Low Tariffs Updated On Wed, Oct 23rd, 2024 by Saurenergy NTPC Vidyut Vyapar Nigam’s (NVVN) first standalone energy storage tender has broken new ground with record low tariffs. While the bids come with viability gap funding, even after accounting for that, the winning bids are lower than the lowest seen so far at Rs 3.41/unit by SECI. The tender with a total capacity 500 MW/ […] Read more
Solar-Storage Can Avert India’s 40 GW Power Shortage By 2027: Berkeley Updated On Mon, Oct 14th, 2024 by Saurenergy India is projected to face a power shortage of 20-40 GW in the evenings by 2027 due to the rapid increase in electricity demand, according to a report by Berkeley. However, this shortfall could become more manageable, considering the significant drop in the prices of gigawatt-scale solar and storage. Recent solar-plus-storage auction results recorded a […] Read more
Assam Issues Its First Standalone BESS Tender For 25 MW Updated On Tue, Oct 8th, 2024 by Saurenergy The New and Green Energy of Assam (NGEAL) has now issued its first standalone tender for the development of a 25 MW/100MWh of Battery Energy Storage (BESS) plant in the state. The agency has planned to develop the standalone BESS center at the Kurkurmara 400 KV grid substation in the Kamrup district of Assam. NGEAL […] Read more
India’s First Second Life Battery UPS In Pune Takes Shape Via MG Motor, Vision Mechatronics Updated On Mon, Oct 7th, 2024 by Saurenergy JSW MG Motor India, the JV between the JSW group and China’s SAIC Motors that has strong portfolio of EVs for India has made a strong sustainability push for the batteries powering its EVs. And with good reason, considering how these sturdy batteries can increasingly be expected to outlast the vehicles they are designed for. […] Read more
SJVN, Maharashtra Partner To Develop PSPs, Floating Solar Projects Updated On Fri, Sep 27th, 2024 by Saurenergy SJVN, a Navratna Central Public Sector Enterprise (CPSE), has signed two Memorandums of Understanding (MoUs) with the Maharashtra government to build Pumped Storage Projects (PSPs) and Floating Solar Projects in the state. The total estimated investment for these projects is approximately Rs. 48,000 crores. It is expected to create around 8,400 direct and indirect employment […] Read more
3 GW Of Pumped Hydro Projects Set To Boost MSEDCL’s Portfolio Updated On Fri, Sep 27th, 2024 by Saurenergy Maharashtra is set to witness the addition of 3 GW of energy storage projects through Pumped Storage Projects (PSPs). These new projects are expected to meet the growing demand of the Maharashtra State Electricity Distribution Company Ltd. (MSEDCL). Two companies, JSW Neo Energy Limited and Torrent Power Limited, have secured contracts to build the projects. […] Read more
Govt Awards Reliance 10GWh ACC Battery Capacity Under PLI Updated On Thu, Sep 5th, 2024 by Saurenergy The Ministry of Heavy Industries (MHI) has now announced the selection of successful bidder under the Production Linked Incentive (PLI) Scheme for Advanced Chemistry Cell (ACC) Battery Storage. Reliance Industries Limited has been awarded 10 GWh ACC capacity under Production Linked Incentive (PLI) scheme based on QCBS mechanism. This initiative is another step towards enhancing […] Read more