Manager Global Reporting Updated On Mon, Sep 27th, 2021 by Saurenergy Responsibilities:- Responsible for the Global Reporting in the CR&QHSE organization and its IT reporting systems. Analyse & deep dive performance reports & drive corrective actions for assigned units. Works with specific unit performance teams on developing the performance culture within the organization and automating the performance mgmt. process. Manages the global CR&QHSE business intelligence dashboards […] Read more
Torrent Power Buys 156 MW Wind Capacity from CESC Updated On Wed, Sep 22nd, 2021 by Saurenergy Torrent Power on Tuesday announced that it has inked a share purchase pact to acquire 156 MW wind power projects for about Rs 790 crore from Surya Vidyut, an arm of CESC Ltd. Surya Vidyut operates 156 MW wind power plants spread across the states of Gujarat, Rajasthan and Madhya Pradesh, a statement said. The […] Read more
“An Electric Future Is Nearer Than We Think”, Mohal Lalbhai, Matter Updated On Wed, Sep 15th, 2021 by Saurenergy Matter is a technology start-up set-up by Mohal Lalbhai, a scion of the Lalbhai Group from Gujarat know more for their textile empire. Founded in January 2019, Matter is a two-year old start-up that seeks to introduce frugal and innovative solutions in the energy storage space which would include batteries for mobility applications, stationary applications, […] Read more
GESCL Floats 35 MW/57 MWh Solar+Storage EPC Tender Updated On Wed, Sep 8th, 2021 by Saurenergy The Gujarat State Corporation Limited (GESCL) has issued a Request for Proposal (RfP) to appoint contractors for the design, engineering, installation, construction, commissioning & operation and maintenance of a 35 MW (AC) solar PV grid-connected power plant along with a minimum 57 MWH battery energy storage system, with 12 years O&M, at its Kutch Lignite Thermal Power […] Read more
Engineer – Electrical Updated On Thu, Aug 26th, 2021 by Saurenergy Responsibilities:- Electrical Design Validation. Electrical Installation Supervision and Validation on site. Ensure Electrical compliance with customer specification. Factory Acceptance Test of Electrical Panels and Supervision. Documentation – Electrical and Instrumentations. Supplier Co-ordination. Tasks:- Electrical Panel Design & Layout, Engineering with EPLAN P8. Prepare Instrumentations & Hookup Drawings. Design Control System, Configure Industrial Network Architecture. Wiring […] Read more
ReNew Power Merges with RMG II, Lists on Nasdaq via SPAC Updated On Wed, Aug 25th, 2021 by Saurenergy Haryana-based ReNew Power has completed its previously announced business combination with RMG Acquisition Corporation II. After the combination, RMG II has become a wholly-owned subsidiary of ReNew Energy Global. Consequently, ReNew’s Class A ordinary shares and warrants commenced trading on the U.S. stock exchange NASDAQ on August 24, 2021. The company listed in the US through […] Read more
TPREL Commissions 150 MW Solar Project in Rajasthan Updated On Tue, Aug 24th, 2021 by Saurenergy Tata Power Renewable Energy Ltd. (TPREL), a wholly-owned subsidiary of Tata Power, has commissioned a 150 MW solar power project in Loharki, a village in Rajasthan. Spread across 756 acres of land, this plant is expected to generate more than 350 million units annually. Approximately 656,700 modules were used in the project, and the installation […] Read more
Maharashtra Renewable Plans Back On Track, Powered By Lower Costs Updated On Thu, Aug 19th, 2021 by Saurenergy 2021 has been a good year so far, for renewable energy growth in Maharashtra, with the primary state discom, Maharashtra State Electricity Distribution Company Limited (MSEDCL) finally happy with the bids it received for its recent tenders. With prices dropping to as low as Rs 2.42 for its last solar tender, besides Rs 2.62 for […] Read more
ENGIE Commissions 200 MW Raghanesda Solar Project Updated On Wed, Aug 18th, 2021 by Saurenergy ENGIE has announced the commissioning of a 200 MWAC (290 MWp) Solar Power Project at the Raghanesda Solar Power Park, in Raghanesda, Gujarat. ENGIE collaborated with multiple Government of Gujarat entities to construct the project that will generate close to 546 gigawatt-hours of electricity. The project was won under a tender process run by GUVNL […] Read more