IOC Sets Sights on RE Capacity Addition, EV Charging Among Others in Restructuring Spree Updated On Mon, Feb 27th, 2023 by Saurenergy The Chairman of Indian Oil Corporation (IOC) Shrikant Madhav Vaidya has said that the CPSU has set its sights on green hydrogen plants at all its refineries. The timeline for this goal has been set for 2047. The announcement comes as part of the Rs 2 lakh crore planned for green transition towards net-zero emissions. […] Read more
Thailand’s CP Foods to Solarize 180 Facilities with 65 MW Capacity Updated On Thu, Feb 23rd, 2023 by Saurenergy Businesses across the world pushing decarbonisation and moving towards net zero commitments. In a key development, Thailand based food conglomerate Charoen Pokphand Foods Public Company Limited (CP Foods) has said that it will increase the installation of solar panels at 180 animal farms, feed mills, and processing plants across Thailand, with a total capacity of […] Read more
Director(Business Development) Updated On Tue, Feb 21st, 2023 by Saurenergy I. COMPANY PROFILE:- GAIL (India) Limited was incorporated in August 1984 as a Central Public Sector Undertaking (PSU) under Ministry of Petroleum & Natural Gas (MoP&NG), with the Mission of “accelerating and optimizing the effective and economic use of Natural Gas and its fractions for the benefit of the national economy”. Government of India now […] Read more
The 5 Questions 2023 Could Answer for Renewable Energy in India Updated On Tue, Feb 21st, 2023 by Saurenergy India has over 174 GW of installed renewable capacity, including large hydropower at the conclusion of December 31, 2022. Solar power constituted the largest share of about 64 GW of the total. Wind power (41.9 GW), large hydro (46.85 GW), biomass/co-generation (10.2 GW), small hydro power (4.93 GW), and waste to energy with 0.52 GW […] Read more
India’s Renewable Energy Installation Stands at 168 GW, Coal-Based Power Grows 536 MW in a Year Updated On Thu, Feb 16th, 2023 by Saurenergy Central Electricity Authority has revealed in its installed electricity capacity report that the renewable energy capacity of the country has crossed 168 GW but the speed of the RE expansion doesn’t give out a comfortable picture considering India’s 2030 targets. The RE installed capacity of India as on January 31, 2023 stands at 168,399 MW. […] Read more
Engineer – Generator Auxiliary – Electrical Updated On Thu, Feb 16th, 2023 by Saurenergy Responsibilities:- To understand the specification of the project, product, customer requirement, Generator operating parameters and operating sequences of Hydro power plant Design / Specification of Generator Instrumentation – for measuring temperature, pressure, flow, Cabling and Terminal boxes, Grounding system, Condition monitoring equipment like Partial discharge, Air gap monitoring, Vibration, Shaft current and Fire protection systems […] Read more
Fraunhofer ISE to be Technology Partner for Emmvee’s New Solar Cell Factory in Bengaluru Updated On Tue, Feb 14th, 2023 by Saurenergy PV modules maker and supplier Emmvee Group has announced that it has signed an MoU with Fraunhofer ISE which is the largest solar research institute in Europe. The MoU appoints Fraunhofer ISE as the solar technology partner of Emmvee for its upcoming solar cell manufacturing facility near Bengaluru. The official statement Emmvee held that the […] Read more
Assistant Manager Sales Support Offer Management Updated On Tue, Feb 7th, 2023 by Saurenergy Technical tendering, interpreting technical design inputs from technology centres, sizing of equipment & piping, technical detailing including P&ID, layout, instrumentation & automation, customer alignment, cost estimation, hazop study of food/dairy/chemical packages/projects in drying, evaporation, vacuum system technology. Responsibilities:- Evaluation of Tender/ enquiry from customer & understanding the technical requirements & preparation for the pre-bid points […] Read more
GERC Provides Only Interim Relief On Replacement of Modules For Old Solar Project Updated On Mon, Feb 6th, 2023 by Saurenergy In a recent order in January, the Gujarat Electricity Regulatory Commission (GERC), when faced with a petition seeking permission to replace solar modules on a project ‘damaged’ by floods, chose to provide interim relief only, reserving the tight to take a final view on the issue. The matter at hand is a very interesting case, […] Read more