Senior Desing Engineer Updated On Thu, Dec 28th, 2023 by Saurenergy Responsibilities:- Prepare and review of plant & equipment 2D/3D layout, hole & foundation plans, ducting and piping layout, fabrication drawings. Prepare pipe isometric, BOQ, MTO. Prepare man hours estimation of detail design engineering activities. i.e. 3D layout, skids etc. Prepare work planning to compete the given task/project on time and within budget. P&ID review and […] Read more
Associate Piping Engineer Updated On Thu, Dec 28th, 2023 by Saurenergy Responsibilities:- Work cooperatively with the team of engineers and technical staff in the Business Unit in the preparation of quotations and execution of projects as and when required. Develop the mechanical design according to given sketches, P&ID’s, layout, and specifications under the direction of engineering team. Create drawings from basic 2D up to complete 3D […] Read more
Inox Wind Bags Repeat Order For 279 MW For Its 3 MW Wind Turbines Updated On Tue, Dec 26th, 2023 by Saurenergy Indian wind energy solutions company Inox Wind has bagged an order for 279 MW from a large Commercial and Industrial (C&I) player. The order is for Inox’s latest 3 MW Wind Turbine Generators (WTGs), and the scope comprises a mix of equipment supply with limited scope EPC for 180 MW and end-to-end turnkey execution for […] Read more
Adani Green Concludes PPA For Entire 8GW Manufacturing-Linked SECI Tender Updated On Mon, Dec 25th, 2023 by Saurenergy Adani Green Energy Ltd (AGEL) has announced the execution of power purchase agreement (PPA) with the Solar Energy Corporation of India (SECI) to supply 1,799 MW of solar power. With the signing of this balance PPA, AGEL has completed the power offtake tie-up for the entire 8,000 MW manufacturing-linked solar tender awarded to it by […] Read more
3,595 Power Consumers In India Get Approval For Green Energy Open Access Updated On Mon, Dec 18th, 2023 by Saurenergy Union Minister for New and Renewable Energy RK Singh, in his latest response before the Lok Sabha, said that as per government records, the Indian government approved the applications of 3,595 power consumers, allowing them to avail of green energy open access. The Ministry of Power in 2022 approved the Green Energy Open Access Rules, […] Read more
Sterling & Wilson Renewable Energy Raises INR 1,500 Cr via QIP Route Updated On Fri, Dec 15th, 2023 by Saurenergy Sterling & Wilson Renewable Energy Limited (SWRE) has announced the completion of a fundraise of INR 1,500 crore through Qualified Institutions Placement (QIP) route. The Securities Issuance Committee of Board of Directors, at its meeting held on December 14, 2023, approved the issue and allotment of 4,32,27,665 equity shares of face value Re. 1 each […] Read more
Solar Civil Engineer Updated On Mon, Dec 11th, 2023 by Saurenergy Hands on experience of detailed civil engineering design in general. Experience of foundation design for PV plant detailed design. Experience of structural design for PV plant detailed design. Detail design of area grading & levelling, road & drain design and layout. Proficiency in software: STADD pro. Well versed with national and international standards like IS, […] Read more
GUVNL Floats Tender for 250 MW/500 MWh Battery Energy Storage Systems Updated On Fri, Dec 1st, 2023 by Saurenergy Gujarat Urja Vikas Nigam Limited (GUVNL) has issued a Request for Selection (RfS) for setting up of pilot projects of 250 MW/500 MWh standalone Battery Energy Storage Systems in Gujarat under Tariff-Based Global Competitive Bidding (Phase-II). The projects will be established under the BOO model. Selection of Battery Energy Storage Systems projects for a total […] Read more
Uttarakhand Notifies Green Energy Open Access 2023 Regulations Updated On Wed, Nov 29th, 2023 by Saurenergy The Uttarakhand Electricity Regulatory Commission (UERC) has notified Green Energy Open Access Regulations 2023. As per the notification by the UERC, the consumer who has contracted demand or sanctioned load of 100 kW or more, either through a single connection or through multiple connections in the name of same consumer aggregating 100 kW or more located […] Read more