ALMM Update: Waaree Energies Dominates, Tata Power At No.2 Updated On Tue, Jan 7th, 2025 by Saurenergy The latest details furnished by the Approved List of Models and Manufacturers (ALMM) for solar modules by the Ministry of New and Renewable Energy (MNRE) indicated that Waaree Energies continues to dominate the list with the highest capacity. On the other hand, several module manufacturing companies are following up with their increased expansion plans. This […] Read more
ENGIE India Targets 7 GW utility Scale Portfolio by 2030 Updated On Tue, Jan 7th, 2025 by Saurenergy In this interview with SaurEnergy, Amit Jain, Managing Director India & South East Asia for ENGIE, the French Multinational Power giant. ENGIE India has been present in the country for a decade now, and looking to play a key role in the country’s transition to a greener grid. The company stands out for its focus […] Read more
Khavda: Gensol Secures EPC Contract For 275 MW Solar Project Updated On Mon, Jan 6th, 2025 by Saurenergy Gensol Engineering, a renewable energy company specializing in solar power engineering, procurement, and construction (EPC) services, secured an EPC contract from a Public Sector Undertaking (PSU). The company secured the contract to develop a 275 MW Solar PV Project at Renewable Solar Park, Khavda Rann of Kutch, Gujarat. The project includes a total bid value […] Read more
Waaree Energies Starts Solar Cell Production Trials At Chikhli Updated On Mon, Jan 6th, 2025 by Saurenergy Indian solar module manufacturer Waaree Energies today announced the commencement of trials for its solar cell manufacturing operations. These trials have begun at its solar cell factory located in Chikhli, Gujarat. This latest development is expected to enhance the backward integration capacity of the Mumbai-based solar company. Led by Hitesh Doshi, the company plans to […] Read more
Sahaj Solar Bags Rs.36.42cr Agri Solarization Order In Tripura Updated On Thu, Jan 2nd, 2025 by Saurenergy Gujarat-based Sahaj Solar recently secured a Letter of Award (LoA) from the Tripura Renewable Energy Development Agency (TREDA) for the solarization of existing 2 HP grid-connected agricultural pumps (IPS). The company stated in a regulatory filing, “These pumps include a 5-year guarantee/warranty and an annual maintenance contract, including insurance coverage, on a turnkey basis in […] Read more
Khavda Adds Another 62.4 MW Wind For Hybrid Project From Adani Updated On Mon, Dec 30th, 2024 by Saurenergy Continuing its momentum to add more renewable energy projects, Adani Green Energy’s (AGEL) step-down subsidiary, Adani Renewable Energy Forty Eight Limited recently commissioned a 62.4 MW wind power component of its wind-solar hybrid project at Khavda, Gujarat. Khavda is expected to see a string of projects over the next two years as it moves towards […] Read more
Aether Commissions 15 MW Captive Solar Project From KPI Green Updated On Mon, Dec 30th, 2024 by Saurenergy Gujarat-based specialty chemicals firm Aether Industries recently commissioned its 15 MW Solar Power Project (AutoTracker Modules) under the Captive Power Producer (CPP) segment. The company secured this project from the KPI Green. The company stated in a regulatory filing, “The project was awarded to a KPI Green Energy subsidiary. It is now operational and powering […] Read more
ACME’s Subsidiary Secures Rs. 1,988 Cr Financing From PFC Updated On Thu, Dec 26th, 2024 by Saurenergy ACME Renewtech Private Limited, a subsidiary of Haryana-based ACME Solar Holdings (ACME Solar) recently secured Rs. 1,988 crore term loan financing from Power Finance Corporation (PFC). This financing will fund the development and construction of a 300 MW Solar-Wind Hybrid Renewable Energy Project. The project will be located in high-resource potential areas, with solar capacity […] Read more
Odisha: IREDA Has Sanctioned Over Rs.3,000 Cr For Green Energy Projects Updated On Tue, Dec 24th, 2024 by Saurenergy Pradip Kumar Das, Chairman and Managing Director (CMD), Indian Renewable Energy Development Agency Limited (IREDA) reaffirmed its commitment to Odisha’s ambitious renewable energy target. The CMD emphasized the state’s vision of achieving 10 GW capacity by 2030. Highlighting its support, the Indian Renewable Energy Development Agency Limited (IREDA) has already sanctioned over Rs. 3,000 crores […] Read more