General Motors Partners With DTE To Source Wind Energy in Michigan Updated On Wed, Feb 27th, 2019 by Saurenergy The company will source 300,000 MWh of locally sourced Michigan wind energy through DTE’s MIGreenPower program. As part of its commitment to increasing its renewable energy footprint globally and finding clean energy solutions near its operations, General Motors Co. has partnered with DTE Energy for 300,000 MWh of wind energy in the state of Michigan. […] Read more
MTCIL Signs 15 Year Agreement For IRU Fiber Lease in Maharashtra Updated On Wed, Feb 27th, 2019 by Saurenergy The first route spans 50 Kms from Kalwa to Padgha. The deal will result in near 100% network uptime from Kalwa (Mumbai) to Padgha link. Sterlite Power’s Convergence business which manages the fiber network of Maharashtra Transmission Communication Infrastructure Link (MTCIL), a joint venture between Sterlite Technologies Ltd and MSETCL (Maharashtra State Energy Transmission Company Ltd) […] Read more
Spain’s Iberdrola Steps Up Plans With Euro 34 Bn Investment Planned by 2022 Updated On Tue, Feb 26th, 2019 by Saurenergy 47% of the overall amount (Euro 16 billion) will be invested in Networks and 39% (Euro 13.3 billion) in Renewables. Generation and Supply will receive 11% of the total (Euro 3.8 billion). Iberdrola is stepping up global growth with investment rising to Euro 34 billion in the 2018-2022 period. This breakthrough means an upward revision from […] Read more
LONGi to Supply 224 MW Modules For Largest “Bifacial+Tracker” Project in US Updated On Tue, Feb 26th, 2019 by Saurenergy The project, which is expected to be completed by the end of 2019, will provide adequate clean electricity to more than 30,000 households. The largest “bifacial+tracker” power generation project in the United States will be built up in Mitchell County, Georgia, with a capacity of 224MW, for which LONGi, a world-leading manufacturer of high-efficiency mono-crystalline […] Read more
Govt Earmarks Rs 88500 Cr to Spur EV Infrastructure and Curb Pollution Updated On Tue, Feb 26th, 2019 by Saurenergy The Indian government has proposed incentives of about Rs 88500 crore in order to help power plants install equipment that will curb emissions and to develop infrastructure for electric vehicles. Out of the allocated budget, a majority of the chunk (nearly 95%) would be used for curbing sulphur emissions from power plants, and the rest […] Read more
Global Wind Capacity Grew By 51.3 GW in 2018 Updated On Tue, Feb 26th, 2019 by Saurenergy According to a new report, the wind industry installed 51.3 GW of new capacity in 2018, a decrease of 3.6% compared to 2017, as total installed wind capacity reached 591 GW. The latest data released by the Global Wind Energy Council shows that the wind energy industry installed 51.3 GW of new capacity in 2018. […] Read more
Cheap Finance Can Make Renewables Cost-Competitive Faster in Developing Countries Updated On Mon, Feb 25th, 2019 by Saurenergy A new report pinpoints how concessional finance can make wind, solar, and batteries cost-competitive faster in developing countries, accelerating the shift from fossil-fuelled power. Cut-rate financing has the potential to substantially speed the transition from fossil-fuelled power generation to renewable energy in developing countries, according to a new report produced by BloombergNEF (BNEF) and commissioned […] Read more
Ford Collaborates With DTE Energy to Procure Wind Energy Updated On Mon, Feb 25th, 2019 by Saurenergy The company will source 500,000 MWh of locally sourced Michigan wind energy through DTE’s MIGreenPower program. US based Ford Motor Company’s Dearborn Truck Plant, and several new buildings on the Ford Research and Engineering Campus and Corktown campus, including Michigan Central Station, will soon be powered by 100 percent locally sourced renewable energy. This is […] Read more
Alinta Energy to Build West Australia’s Biggest Wind Farm Updated On Mon, Feb 25th, 2019 by Saurenergy The 214 MW Yandin Wind Farm will comprise 51 (4.2 MW) turbines – which could power up to 200,000 homes per year. Alinta Energy will build West Australia’s biggest wind farm by mid-2020 after appointing leading global wind company Vestas as its engineering, procurement and construction partner. The 214 MW Yandin Wind Farm will comprise 51 (4.2 MW) turbines – which could power up to 200,000 homes […] Read more