Alpex Solar Bags Two Order Under PM-KUSUM Scheme In Haryana Updated On Tue, Mar 19th, 2024 by Saurenergy Noida-based Solar sector company Alpex Solar Limited has announced that it has secured an order from the Department of New & Renewable Energy Haryana (HAREDA), under the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM Scheme), for the provision of 1434 solar water pumping systems. The systems will further be deployed for agricultural purposes. […] Read more
Germany-based RWE Begins Building 330 MW UK Solar Projects Updated On Mon, Mar 18th, 2024 by Saurenergy Germany-based clean energy company RWE has initiated work related to seven projects, representing 330 megawatts (MW) of new, clean electricity capacity, now entering construction in the United Kingdom. The projects are the first to be constructed from the solar portfolio secured by RWE through its acquisition of JBM Solar, one of the UK’s largest independent […] Read more
Canada-Based Brookfield Asset Management Commissions Solar Plant In Bikaner Updated On Fri, Mar 15th, 2024 by Saurenergy Canadian investment firm Brookfield Asset Management announced the commissioning of the first phase of a solar energy project in Bikaner, Rajasthan. “This marks a significant milestone in the development of what is poised to be India’s largest renewable energy park with inter-state transmission system connectivity,” stated the company in its media statement. The first phase […] Read more
Sineng Powers 53MW Solar Plant in Romania With String Inverter Solution Updated On Fri, Mar 15th, 2024 by Saurenergy The Glodeni solar power plant, with a capacity of 53MW and powered by Sineng’s string inverters, has been connected to the grid and is now fully operational. Owned by DTEK, a world-class energy enterprise, this project is one of the first solar parks developed in Romania since the ending of the government support scheme in […] Read more
Trina Solar Announces Ownership of TOPCon Technology Patents Updated On Thu, Mar 14th, 2024 by Saurenergy Smart solar products and solutions company Trina Solar, announced its ownership of over 2000 patents, including a significant number of core TOPCon technology patents, in addition to PERC and Heterojunction (HJT) technology patents. The patents protect Trina’s intellectual property (IP) rights to critical N-type TOPCon technology used in solar module production and strengthen Trina’s position […] Read more
PERC Extends Settlement Period For Rooftop Solar To 31st March 2025 Updated On Thu, Mar 14th, 2024 by Saurenergy Punjab State Electricity Regulatory Commission (PSERC) recently amended the grid interactive rooftop solar photo voltaic systems) regulations, 2021. This regulation is also called the (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021. PERC in its revised notification changed the settlement period, it mentioned, “The current settlement period of rooftop solar photo voltaic systems set […] Read more
India’s Solar Capacity Crosses 75 GW, Says Latest CEA Report Updated On Thu, Mar 14th, 2024 by Saurenergy The latest data on renewable energy capacity additions released by the Central Electricity Authority (CEA) said that India’s total installed capacity of solar power crossed 75 GW. The data from the government entity said that in the initial two months of 2024, India added a total of 2,257 MW of solar power. The additions are […] Read more
Equinor Commissions 531 MW Brazil Solar Farm Updated On Wed, Mar 13th, 2024 by Saurenergy A Norway-based international energy company Equinor has commenced the operation of the 531 MW Mendubim solar plant in Brazil. This has marked a 30% increase in Equinor’s equity power production in Brazil. Mendubim will annually produce 1.2 TWh of power. Around 60% of the power will be sold on a 20-year USD-denominated power purchase agreement […] Read more
L&T Emerges Lowest Bidder For 100 MW Jharkhand Floating Solar Project Updated On Tue, Mar 12th, 2024 by Saurenergy Solar Energy Corporation of India Limited (SECI), announced Larsen and Toubro (L&T) Limited as the most advantageous and lowest L1 successful bidder for a 100 MW floating solar PV project. SECI commissioned this project for operation and management (O&M) design, engineering, supply, construction, erection, testing, and commissioning of the floating solar project for five years. […] Read more