AM/Senior Engineer – Performance Updated On Wed, Jun 4th, 2025 by Saurenergy Carry out solar resource assessment for various available resources based on the Project location Analysis of Energy Yield Numbers for various scenarios with different technology and optimizing the Plant Layout. Providing BOQ for the Project based on the AC & DC Cable Loss Calculation, Optimized Scenario. Evaluation of Module technology based on the documentation received […] Read more
Mechanical Engineer – Thermal Updated On Wed, Jun 4th, 2025 by Saurenergy As a Senior Manager/Sr. Manager/DGM Mechanical Engineer, with a focus on combined cycle power plants, you will play a critical role in the design and development of the main plant components (Gas Turbines, Heat Recovery Steam Generators, Steam Turbines, and related systems) for our projects. Your expertise in mechanical engineering, combined with your in-depth knowledge […] Read more
Procurement : Battery Energy Storage Systems Updated On Fri, May 9th, 2025 by Saurenergy Key Responsibilities:- Oversee procurement processes for BESS, ensuring compliance with industry standards and government guidelines. Collaborate with suppliers and manufacturers to source high-quality battery systems. Evaluate bids and negotiate contracts with vendors. Ensure integration of BESS with renewable energy systems and grid infrastructure. Understanding advanced technologies like lithium-ion batteries, flow batteries, and their integration with […] Read more
Waaree Energies Bags 362.5 MWp Solar Modules Supply Order Updated On Thu, Feb 20th, 2025 by Saurenergy Waaree Energies has secured an order to supply solar modules for 362.5 MWp from a renowned customer engaged in the business of owning, developing, and operating renewable power projects in India. The company said in a regulatory filing, the supply of modules is scheduled to commence in FY 2025-26. The order adds to an already bulging […] Read more
Winning Bids Cross Rs 3/kWh In SECI’s 1 GW Solar Tender Updated On Thu, Dec 26th, 2024 by Saurenergy In an ominous sign of changing market dynamics, SECI’s 1000 MW Tranche XVIII tender for ISTS connected solar projects has attracted winning bids, all over Rs 3/kWh. The tender, released in September this year, has ReNew Solar Power( 250 MW at Rs 3.04), Acme Solar holdings (300 MW at Rs 3.05) and Adani Green Energy […] Read more
Lender’s Engineer – Renewables Updated On Thu, Dec 19th, 2024 by Saurenergy Capable of handling the project related to solar, wind, battery energy storage system (BESS) as a project manager and will be responsible for all the internal and external communication related to the Project. Overview and In-depth knowledge of wind, solar and BESS projects. Capable of handling Owners Engineering (Review of Design Documents), Detailed engineering design […] Read more
Assistant Manager CAD (CIVIL -SOLAR PROJECTS ONLY)) Updated On Thu, Dec 19th, 2024 by Saurenergy Responsibilities:- India and Overseas site visits during various phases of the project (pre-bid, construction, Operation and Maintenance) and prepare site visit report, site feasibility assessment and remedial measures for Solar PV plant as per requirement. Review preliminary investigation reports, Geo-technical, topography, hydrology and prepare executive summary from the reports and shall propose best suitable solution […] Read more
The Renewable Energy Developers Whose Plans Will Shape India’s Solar Targets Updated On Thu, May 9th, 2024 by Saurenergy India reached a notable milestone in renewable energy by adding a record-breaking 18.48 GW in 2023-24, a 21 per cent increase from the previous year. As of March 31, 2024, India’s installed renewable energy capacity stood at 143.64 GW, excluding large hydropower projects. The country needs an annual addition of at least 50 GW for […] Read more
Australia’s First Offshore Wind Farm A Step Closer Updated On Thu, May 2nd, 2024 by Saurenergy Australia, which has seen a massive ramp up in its solar capacity, is finally making a move to add offshore wind to its renewables portfolio as well, with plans for the first offshore wind farms reaching feasibility stage with the handout of licenses to prospective project studies. With no nuclear plant in the country, Australia […] Read more