Ayana and Maxeon Complete and Commission 192MWp Bikaner 1 Project Updated On Mon, Mar 14th, 2022 by Saurenergy Ayana Renewable Power and Maxeon Solar Technologies have announced the completion and commercial operation of the 192 megawatt (MW) Bikaner 1 Solar Farm in Rajasthan. It’s a utility-scale solar power plant built in the second half of 2021 and commissioned in December 2021. Bikaner 1 solar power plant has utilized a total of nearly 398,000 Performance 3 […] Read more
£10 M funding competition launched to strengthen net zero technologies Updated On Fri, Mar 11th, 2022 by Saurenergy The Net Zero Technology Centre has announced the launch of its 2022 Open Innovation Programme, aimed at developing and deploying technologies that will reduce offshore emissions, accelerate clean energy production, and enable delivery of the UK’s net zero ambitions. The 2022 programme will feature two funding competitions – the first opening on 16th March and […] Read more
The Top 5: Reasons Indians are Hesitant to go with E2W Updated On Wed, Mar 9th, 2022 by Saurenergy India is the largest two-wheeler mobility market in the world, with sales peaking at 21 million units in 2019. With the growing concerns over pollution-induced climate change, electric mobility is seen as a substitute for fossil-fuel-dependent conventional vehicles. Two wheelers is also where adoption is expected to be earlier and faster due to lower costs […] Read more
Central Railway Adds 4 More Locations Generating Solar Power in Maharashtra Updated On Mon, Mar 7th, 2022 by Saurenergy Rooftop solar installations in four more railway properties have begun to produce solar power in the Central Railway zone. The four newly added locations are Igatpuri railway hospital, Igatpuri railway station, Kasara railway station and Titwala cabin. The Central Railway says that that with the addition of the four new locations in the network, the […] Read more
European Commission President Bats for Hydrogen and Renewables to Russian Overhang Updated On Mon, Mar 7th, 2022 by Saurenergy European Commission President Ursula von der Leyen has said that Europe must expedite expansion of renewables and hydrogen to achieve energy security and displace Russian gas dependency. Just as political, diplomatic, economic and other sanctions continue to heap over Russia for its armed struggle in Ukraine, many European countries – including Germany – have faced […] Read more
Brazil Crosses 14 GW Solar Capacity Mark Updated On Fri, Mar 4th, 2022 by Saurenergy The installed solar power capacity of Brazil has reached the 14 GW milestone. The announcement of the major achievement was made by ABSOLAR which is a domestic solar power association. Out of the 14 GW solar power presently installed in the South American country, distributed technology installations amount to 9.3 GW. The large-scale solar plants […] Read more
Consultant (Developer/Programmer- Backend) Updated On Thu, Mar 3rd, 2022 by Saurenergy The International Solar Alliance (ISA) is working to place solar energy at the heart of addressing energy poverty and arresting climate change since its launch in 2015. The only multi-government body in this domain, ISA has endeavored to create a global paradigm for concerted action to bring reliable and affordable solar energy within the reach […] Read more
Consultant (Developer/Programmer-Frontend) Updated On Thu, Mar 3rd, 2022 by Saurenergy BACKGROUND:- The International Solar Alliance (ISA) is working to place solar energy at the heart of addressing energy poverty and arresting climate change since its launch in 2015. The only multi-government body in this domain, ISA has endeavored to create a global paradigm for concerted action to bring reliable and affordable solar energy within the […] Read more
Autocad Drafter (Solar PV) Updated On Wed, Mar 2nd, 2022 by Saurenergy Compiling equipment data and specification sheets Preparing general arrangement drawings, plans, sections, elevations, details, schedules etc. Handle multiple revisions while ensuring engineering data and details accuracy Ability to switch between multiple projects quickly Maintain records of revisions and project level deliverables Qualifications And Experience:- Candidates having recent one year of hands-on AutoCAD experience to apply […] Read more