Senior Analyst – Transaction(Power/Solar/Wind/BESS) Updated On Thu, Feb 20th, 2025 by Saurenergy Responsibilities:- Consulting Capability:- Delivers or contributes to the development of work products throughout at least one phase of an engagement Co-facilitates group discussions with team members or client representatives Uses recognized methods to deliver work products Contributes to risk and issue identification and synthesis of solutions Industry Knowledge Capability:- Delivers work products and demonstrates a […] Read more
CEL Seeks EoI For 40 MWp Automated Solar Manufacturing Plant Updated On Thu, Feb 20th, 2025 by Saurenergy Central Electronics Limited (CEL), has issued an Expression of Interest (EOI) seeking vendors to identify domestic suppliers for outsourcing the Automated Solar PV Module Manufacturing Plant. The plant has an annual capacity of 40 MWp when operated in three shifts and will be located in Sahibabad on an ‘as-is-where-is’ basis. The last date for EoI […] Read more
RenewSys Signs Pact With Radiance To Supply TOPCOn Modules Updated On Thu, Feb 20th, 2025 by Saurenergy Indian solar module manufacturer RenewSys India today announced formalizing an agreement with Radiance Renewables Private Limited. This partnership will ensure a supply of 72.5 MWp of advanced 590 Wp TOPCon Glass-to-Glass solar PV modules. The deliveries have been planned between December 2024 and March 2025. Radiance Renewables Private Limited is an India company in India’s […] Read more
CERC Adopts tariff For SECI’s 1200 MW Wind Solar Hybrid Projects Updated On Thu, Feb 20th, 2025 by Saurenergy In an order dated February 18, the Central Electricity Regulatory Commission has adopted the proposed tariffs for SECI’s 1200 MW Hybrid projects comprising wind and solar energy under Tranche VIII. SECI had issued the letter of awards to the winning bidders on June 20, 2024. The projects will now await the signing of formal PPAs, […] Read more
Waaree Energies Bags 362.5 MWp Solar Modules Supply Order Updated On Thu, Feb 20th, 2025 by Saurenergy Waaree Energies has secured an order to supply solar modules for 362.5 MWp from a renowned customer engaged in the business of owning, developing, and operating renewable power projects in India. The company said in a regulatory filing, the supply of modules is scheduled to commence in FY 2025-26. The order adds to an already bulging […] Read more
Project Manager – Solar Updated On Wed, Feb 19th, 2025 by Saurenergy Responsibilities: Project Planning and Execution:- Lead the planning and execution of solar energy projects from conception to completion. Develop comprehensive project plans, timelines, and budgets, ensuring adherence to deadlines and financial objectives. Stakeholder Coordination:- Collaborate with internal teams, including engineering, procurement, and construction, to ensure seamless project delivery. Liaise with external stakeholders, such as clients, […] Read more
Bifacial Modules Delivered 32% More Power Than Monofacial: Report Updated On Wed, Feb 19th, 2025 by Saurenergy The latest research report by Enverus found an increase in the average rated power capacity per simulation, which reached 340 MW in Q3 2024. It found that countries like Saudi Arabia, Portugal, Australia, and Brazil recorded the highest average rated power capacity per simulation in 2024, followed by Indonesia, South Africa, Chile, and the US. […] Read more
Green Stocks Feb 19: Stocks Claw Back Losses Updated On Wed, Feb 19th, 2025 by Saurenergy On an ordinary day with no decisive move for the Nifty, our green pack certainly found the energy to make a move to recover some of the lost ground in recent weeks. That meant stocks like Shakti Pumps, KPI Green, and even SWREL made strong gains. Wind energy stocks Inox Wind and Suzlon gained as […] Read more
System Design and Study Engineer Updated On Wed, Feb 19th, 2025 by Saurenergy Engineering authority in design studies and performance evaluation studies for projects/tenders for Flexible A.C. Transmission Systems (FACTS) technology aligned with Power Quality Solutions (PQS) Business. Roles and responsibilities: Define topology and single line diagram for FACTS solution based on customer requirement. Specify main circuit components such as Power Transformer, Power Electronics Valves, Reactors, Capacitors, CT, VT, Breaker etc. based […] Read more