BattRE Surpasses ₹100 Cr Revenue, Maintains Profitability Updated On Tue, Mar 25th, 2025 by Saurenergy Electric two-wheeler manufacturer BattRE is back on a growth trajectory, reporting an 18% increase in FY24, compared to a 6% decline in FY23. However, its profit remained unchanged during the last fiscal year. BattRE’s revenue from operations increased to Rs 102.5 crore in FY24 from Rs 87 crore in FY23, according to its financial statement […] Read more
ADB & Shriram Finance Sign Deal To Boost EV Financing in India Updated On Tue, Mar 25th, 2025 by Saurenergy The Asian Development Bank (ADB) and Shriram Finance Limited have signed a loan agreement for $150 million to boost access to finance for micro, small, and medium-sized enterprises (MSMEs) in India. The agreement will focus on granting business loans for financing electric vehicles (EVs) and low-emission commercial vehicles for business purposes. The loan will particularly […] Read more
RBI Extends Priority Sector Lending For RE Projects Upto Rs 35cr Updated On Tue, Mar 25th, 2025 by Saurenergy The Reserve Bank of India (RBI) has now extended funding for renewable projects in the country up to 35 crore under the Priority Sector Lending. The central bank regulator has issued revised guidelines on Priority Sector Lending (PSL) after a comprehensive review of existing provisions, incorporating feedback from stakeholders. The revised funding is cover the […] Read more
Delhi Govt Allocates Rs 50cr For PM Surya Ghar ‘Top Up’ Updated On Tue, Mar 25th, 2025 by Saurenergy Delhi Chief Minister Rekha Gupta today presented her maiden budget for the Union Territory. In her speech before the State Assembly, the CM talked about making the region self-sufficient in energy. She also talked about boosting the growth of solar energy in the state through the new Delhi Budget. In her speech, Gupta talked about […] Read more
Senvion Announces Crossing 1 GW WTG Capacity In India Updated On Tue, Mar 25th, 2025 by Saurenergy Wind turbine manufacturer Senvion today announced crossing 1 GW of wind turbine manufacturing capacity in India. Meanwhile, the firm also announced completing the manufacturing of 500 nacelles from the Baramati (Maharashtra) plant and 500 sets of blades from blade factories in Vadodara (Gujarat) and Tiruchirappalli (Tamil Nadu). “Senvion runs its business with Make in India […] Read more
VP Technology & Head Updated On Tue, Mar 25th, 2025 by Saurenergy Eaton is hiring a VP of Technology & Head for its Eaton India Innovation Center (EIIC) in Pune. Reporting to the EVP/CTO, this role involves leading over 2000 engineers and technologists across two campuses. Since 2003, EIIC has driven technology research, product development, and engineering support for Eaton’s global clients. The VP Technology will lead […] Read more
IIT Madras Unveils EV Labs To Advance Battery & Charging Tech Updated On Tue, Mar 25th, 2025 by Saurenergy The Indian Institute of Technology, Madras (IIT Madras) has launched ‘Zero e-mission,’ a comprehensive set of e-mobility initiatives spanning various domains, including Education, Skilling, Research, Policy, Outreach, and Safety. Led by the Department of Engineering Design at IIT Madras, these initiatives aim to foster strong industry collaborations to accelerate India’s EV transition. The initiatives launched […] Read more
MERC Orders MSEDCL to Refund Faulty Open Access Charges Updated On Tue, Mar 25th, 2025 by Saurenergy The Maharashtra Electricity Regulatory Commission (MERC) has directed MSEDCL to refund charges incorrectly levied on three solar power generators. The order came to the limelight after three SPVs of Tata Power approached the state power regulator. The petitioners blamed the Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for incorrectly levying charges for open-access connections. The […] Read more
Telangana Discovers BESS Tariff At ₹2.40 Lac/MW/Month Updated On Tue, Mar 25th, 2025 by Saurenergy Telangana has awarded its 500 MWh with a standalone Battery Energy Storage System (BESS) project tender at a tariff in the range of Rs. 2.40-2.45 lakh/MW/month. This is one of the first tenders released by Telangana Genco (TGGENCO) for a 500 MWh (250 MW x 2 hours) project. TGGENCO issued the tender with Viability Gap […] Read more