SUBSCRIBE NEWS LETTER

ET Energy

Greenbacker buys majority of 12.1 MW rooftop solar portfolio from OneRoof Energy

On the heels of a recent $25 million wind power investment, Greenbacker Renewable Energy Company acquired a controlling interest in a 12.1 MW portfolio of 1611 solar systems from a subsidiary of OneRoof Energy Inc., approximately for $19.75 million. The 12.1 MW systems are located on residential rooftops across seven U.S. states, including New Jersey, […]

Read more

Central Government should renew its focus on the DBFOT framework: Simarpreet Singh, Head – Strategy, Hartek Power

Hartek Power Pvt Ltd is one of India’s fastest growing Engineering, Procurement and Construction (EPC) companies with expertise in executing high-voltage substation turnkey, rooftop solar projects and manufacturing a complete range of power distribution equipment/solutions to the needs of the industry and utilities. The company has four strategic business units—Power Systems, Rooftop Solar, Power Distribution […]

Read more

SECI invites bids for 100 MW Grid PV project with Battery Energy Storage System in Kadapa Solar Park, AP

Solar Energy Corporation of India Limited (SECI) is inviting bids for selection of Solar Power Developers for setting up of 100 MW Grid connected solar PV projects along with large scale battery energy storage system at Kadapa Solar Park, Andhra Pradesh. The tender come as part of National Solar Mission (NSM) Phase-II, Batch-IV. Interested bidders […]

Read more

Option One Solar joins Sunpreme Channel network

California based solar installer, Option One has joined Sunpreme Channel network — a strategic partnership program designed to deliver solar expertise to residential and commercial rooftop clients through solar installers. Option One Solar provides the residential and commercial solar markets with best and reliable solar packages while delivering better installation quality and customer service. “We are […]

Read more

Russian group Solar Energy Holding granted permit to develop 90 MW of solar plants

KompleksIndustriya and Energoholding, two companies that are part of the Russian group Solar Energy Holding have been granted permit to develop six solar parks totaling 90 MW, each with a 15 MW capacity at the site based in Russia’s southern Astrakhan Region. The facilities for solar plant will be built in Volodarsky, Privolzhsky, Yenotayevsky and […]

Read more

Ministry of Power sanctioned 4604 DDG Projects to cover 4745 Villages & Hamlets: Piyush Goyal

Ministry of Power is implementing Decentralized Distributed Generation (DDG) under Deen DayalUpadhyaya Gram JyotiYojana (DDUGJY) through Rural Electrification Corporation to provide access to electricity to un-electrified villages/habitations where grid connectivity is either not feasible or not cost effective. Piyush Goyal Minister of State (IC) for Power, Coal, New & Renewable Energy and Mines in the […]

Read more

Solar Rooftop Market in India to Grow at 60% Till 2021: TechSci Research

TechSci Research in its latest report  “India Solar Rooftop Market By State, By End User , By Connectivity, Forecast and Opportunities, 2021” has revealed that with increasing number of government initiatives coupled with favorable policy environment will boost solar rooftop market in India through 2021. India’s solar power potential within the country’s geographical limits is […]

Read more

Manipur Legislative Assembly to get Solar Power

Thokchom Lokeshwar, Manipur’s Legislative Assembly Speaker has inspected the Assembly complex to install a 500 KW solar power plant within the premises. The installed solar plant will cater to the power requirements of Manipur Legislative Assembly, especially at the time when there is power outage due to extreme weather conditions. Accompany Mr. Lokeshwar, Additional Chief […]

Read more

Kalindi Kunj Metro Depot to get Solar Plant atop Elevated Stabling Shed

Delhi Metro will be installing a 3-MWp solar power plant onto an elevated stabling line of Kalindi Kunj metro depot, which will the the first-ever such shed being built in the DMRC network. DMRC told PTI, “The work on the stabling shed will be completed in about six months and then the solar plant will […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll