Urban Development Dept Issues Tender For 340 kW Rooftop Solar on HDMC Buildings Updated On Wed, Apr 3rd, 2019 by Saurenergy The last date for bid submission is May 8, 2019 The Urban Development Department (UDD) on behalf and for the Hubli – Dharwad Municipal Corporation (HDMC) has issued tender for setting up of rooftop solar projects totalling 340 kW on net metering or gross metering models at multiple locations owned by HDMC in the Hubballi […] Read more
BESCOM To Make 112 Solar EV Charging Stations Operational by August End Updated On Wed, Apr 3rd, 2019 by Saurenergy To ensure that Electric vehicles continue to be driven by clean energy, Bangalore Electricity Supply Company (Bescom) is in the final process to set up over 100 solar EV charging stations. As many as 112 EV charging stations are expected to be ready for use by August-end in the capital city. The charging stations have […] Read more
Karnataka Issues Tender For 3 MW Solar Plant in Belagavi Updated On Wed, Apr 3rd, 2019 by Saurenergy The last date of bid submission is April 10, 2019 The Karnataka Power Corporation Ltd. (KPCL) has floated a tender for the installation of 700 solar PV modules of 230 Wp capacity for a 3 MW solar PV power plant at Itnal Village in Belagavi district in the state. The brief scope of work for […] Read more
Nordex Group Bags Another Major Order For its N149 Turbine in Australia Updated On Wed, Apr 3rd, 2019 by Saurenergy The expected volume of electricity to be produced by the wind farm equates to the annual consumption of some 115,000 households and is equivalent to a saving of 532,000 tons of toxic CO2 per annum. Nordex Group has been awarded a contract to supply and install 35 wind turbines for the Mortlake South Wind Farm […] Read more
GE Selected as Technology Provider For Onshore Wind Project in Spain Updated On Wed, Apr 3rd, 2019 by Saurenergy The 342MW Phoenix project will produce power across 10 wind parks in Aragon, Spain, and GE will install 91 onshore wind turbines from its 3MW platform. GE Renewable Energy has been selected as the technology provider for the Phoenix onshore wind project in Aragón Spain. The 342 MW project will be developed by Mirova, ENGIE, […] Read more
REIL Issues Tender For 1.7 MW Solar Plus Storage Project at Andaman & Nicobar Islands Updated On Wed, Apr 3rd, 2019 by Saurenergy The last date for bid submission is May 6, 2019. The Rajasthan Electronics and Instruments Ltd (REIL) has issued tender inviting bids from eligible bidders for the deployment of a 1.7 MW solar PV power plant with Battery Energy Storage System (BESS) at Andaman and Nicobar Islands. The brief scope of work for selected bidder(s) […] Read more
MNRE Announces Draft of Quality Control Order for Solar Thermal Systems Updated On Wed, Apr 3rd, 2019 by Saurenergy The Order — Solar Thermal, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2019 – will come into force a year after its publication in the Official Gazette. To address and ensure quality of solar components across India’s solar power ecosystem, Ministry of New and Renewable Energy (MNRE) has floated a draft quality […] Read more
More than 300 GW of New Wind Capacity to be Added in Next 5 Years : GWEC Updated On Wed, Apr 3rd, 2019 by Saurenergy GWEC forecasts over 300 GW of wind capacity to be added in the next 5 years, with growth to come from emerging markets and offshore wind. According to a new report, 2018 was a positive year for the wind industry, with 51.3 GW of new installations. With market-based mechanisms, such as auctions, tenders and Green […] Read more
NTPC Floats Tender For 3 MW Solar Plant in Bihar Updated On Wed, Apr 3rd, 2019 by Saurenergy The last date of bid submission is April 22, 2019. NTPC Ltd. has issued a tender inviting bids from eligible bidders for the deployment of a 3 MW grid-connected solar PV power plant at NTPC-Kahalgaon in Bhagalpur, Bihar. The brief scope of work for selected bidder(s) will include the Design Engineering, Supply, Construction, Erection, Testing […] Read more