Tender for 14 MW Solar With 42 MWh BESS Issued in Leh and Kargil Updated On Sat, Feb 1st, 2020 by Saurenergy SECI has issued an RfS for setting up of 14 MW solar power plants with 42 MWh Battery Energy Storage Systems in Leh and Kargil The Solar Energy Corporation of India (SECI) has issued a Request for Selection (RfS) for setting up of 14 MW solar power plants with 42 MWh Battery Energy Storage Systems […] Read more
SECI Issues NIT for 5000 MW Power From Renewable and Thermal Sources Updated On Sat, Feb 1st, 2020 by Saurenergy SECI has issued an NIT for the procurement of 5000 MW power on the Round-The-Clock basis, from renewable energy projects, complemented with thermal power. The Solar Energy Corporation of India (SECI) has issued a Notice Inviting Tender (NIT) for the procurement of 5000 MW power on Round-The-Clock based, from renewable energy projects, complemented with thermal […] Read more
Greenko, ReNew Power win SECI’s 1.2 GW Hybrid Plus Storage Tender Updated On Sat, Feb 1st, 2020 by Saurenergy Greenko Group and ReNew Power have won with their bids in SECI’s 1.2 GW wind-solar hybrid projects with energy storage tender and peak power supply. The Greenko Group and ReNew Power have won with their bids in the Solar Energy Corporation of India’s (SECI) 1.2 GW wind-solar hybrid power projects with energy storage tender and […] Read more
Economic Survey 2019-20. Opportunity Ignored? Updated On Fri, Jan 31st, 2020 by Saurenergy The Economic Survey for 2019-20 was presented by Finance Minister Nirmala Sitharaman today in parliament. The survey, which is taken as a useful indicator of government intent, though not always ability to take action, is notable for what it talks about, and perhaps worryingly, what it ignores. Thus, in a survey where there seems to […] Read more
EY Announces Commitment to be Carbon Neutral by end of 2020 Updated On Fri, Jan 31st, 2020 by Saurenergy EY has announced that it plans to become carbon neutral by the end of 2020, by both reducing and offsetting its carbon emissions. EY has announced that it plans to become carbon neutral by the end of 2020, by both reducing and offsetting its carbon emissions. The commitment reflects the firms’ focus towards becoming a […] Read more
Capstone Infrastructure Acquires 51% Stake in 132 MW Solar Project Updated On Fri, Jan 31st, 2020 by Saurenergy Capstone Infrastructure has announced that it has successfully acquired a 51 percent interest in the 132 MW Claresholm Solar Project from Perimeter Solar. Capstone Infrastructure Corporation has announced that it has successfully acquired a 51 percent interest in the 132 MW Claresholm Solar Project from Perimeter Solar Inc. The remaining 49 percent interest is indirectly […] Read more
EXIM Bank Grants $35.8 Mn to Republic of Suriname for Hybrid PV Systems Updated On Fri, Jan 31st, 2020 by Saurenergy Exim Bank has extended a LOC to the Government of the Republic of Suriname, for financing a rural electrification project using solar DG hybrid PV systems The Export-Import Bank of India (Exim Bank) has, on behalf of the Government of India, extended a Line of Credit [LOC] of USD 35.80 million, to the Government of […] Read more
Tenders Issued for Solar Plants for Agro-PV-Concept at NISE Gurugram Updated On Fri, Jan 31st, 2020 by Saurenergy NISE has issued a tender for the commissioning of the 30 kWp solar PV power plant at the NISE Campus in Gurugram. The National Institute of Solar Energy (NISE) has issued a tender, inviting bids from original manufacturers of solar PV modules, for the commissioning of the 30 kWp solar photovoltaic (SPV) power plant at […] Read more
BHEL Tenders for O&M of 1.7 MW Solar Plant in MP Updated On Fri, Jan 31st, 2020 by Saurenergy BHEL has issued a tender for undertaking the O&M of a 1.7 MW solar power plant in Bina, Madhya Pradesh. Bharat Heavy Electricals Limited (BHEL) has issued a tender, inviting bids from eligible vendors for undertaking the operation and maintenance (O&M) of a 1.7 MW solar power plant in Bina, Madhya Pradesh. The scope of […] Read more