SECI Issues Tender for 800 MW Renewable Energy with Storage Updated On Wed, Aug 16th, 2023 by Saurenergy SECI has issued an RfS for 800 MW firm and dispatchable power from ISTS-connected Renewable Energy (RE) power projects (SECI-FDRE-III) under the Standard Bidding Guidelines. The date of pre-bid meeting is August 28, 2023. The last date of bid submission is September 29, 2023. The last date to submit bids is September 29, 2023. Bid […] Read more
Electrify America’s 75 MW Solar Farm Gets the Ball Rolling Updated On Wed, Aug 16th, 2023 by Saurenergy Electrify America, the open network of DC fast chargers for electric vehicles (EVs) in the US has kickstarted operations of its 75 MW solar renewable energy generation project referred to as Electrify America Solar Glow 1, located in San Bernardino County, CA. The Electrify America Solar Glow 1 extends to over a square mile and […] Read more
KPI Green Energy Inks Agreement for Renewable Energy with MAHAPREIT Updated On Wed, Aug 16th, 2023 by Saurenergy KPI Green Energy Ltd, the solar vertical of KP Group and a firm that produces renewable energy, has entered into a memorandum of understanding (MoU) with Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT). MAHAPREIT is a subsidiary of Maharashtra’s MPBCDC (Mahatma Phule Backward Class Development Corporation). KPI Green Energy will work on several […] Read more
IREDA Reports Net NPA Reduction, Profit Jump In Q1 Fy24 Updated On Wed, Aug 16th, 2023 by Saurenergy Indian Renewable Energy Development Agency Ltd. (IREDA), a Mini Ratna (Category – I) Government of India enterprise under the administrative control of Ministry of New and Renewable Energy, has reported an all-time high Quarterly Profit After Tax (PAT) of Rs. 295 crores and Profit Before Tax (PBT) of Rs. 440 crores in the 1st Quarter […] Read more
Advanced Chemistry Battery Market Demand in India Expected to Grow to 220 GWh by 2030 Updated On Mon, Aug 14th, 2023 by Saurenergy The Confederation of Indian Industries (CII) has released a report entitled ‘Raw Materials for Battery & Component Manufacturing’. The report delves into the following aspects of the Indian battery and component manufacturing industry- The Speedbreakers to EV Industry Growth The report highlights the significant need for localisation of the EV ecosystem in India, as well […] Read more
India Added 2 GW Of Wind Energy In First 7 Months Of 2023 Updated On Mon, Aug 14th, 2023 by Saurenergy An analysis of India’s monthly installed capacity data for the last two years, released by the Central Electricity Authority (CEA), revealed that wind energy continues to see upward growth. Its growth is quite evident in the first seven months of 2023 compared to its performance during the same period in 2022. On the other hand, […] Read more
AmpIn Energy Joins Hands with JCAPCPL for 2.8 MWp Solar Project Updated On Mon, Aug 14th, 2023 by Saurenergy AmpIn Energy Transition, a renewable energy IPP and energy transition platform has entered into a 25-year Power Purchase Agreement (PPA) with JCAPCPL (a JV between Tata Steel & Nippon Steel) to supply 2.8 MWp of solar energy for its plant in Jamshedpur. Ujjal Chakraborti, Managing Director of JCAPCPL, and Pinaki Bhattacharyya, Managing Director and CEO […] Read more
Detail Design engineer Updated On Fri, Aug 11th, 2023 by Saurenergy Project Engineering focuses on designing, communicating, and implementing an operational plan for completing an engineering-based project including: Preparing designs, project controls and specifications, schedules, cost estimates, production, transportation, installation, testing and/or commissioning of new infrastructure, facilities, equipment, etc. Monitoring progress and performance against the project plan; taking action to resolve operational problems and minimize delays. […] Read more
KORE Power Chosen by Energy Vault for US Battery Production from 2025 Onward Updated On Fri, Aug 11th, 2023 by Saurenergy Swiss energy storage firm, Energy Vault, has chosen KORE Power, a company based in Coeur d’Alene, Idaho, to supply batteries produced domestically. The anticipated launch of Phase 1 at the KOREPlex facility in Arizona is set for 2025. A Master Supply Agreement was announced earlier this week, outlining an initial delivery capacity of 1.3 GWh […] Read more